- 21. Influence of parameters of a rubber-rope cable on the torsional stiffness of the body of the winding
- (Geotechnical and mining mechanical engineering, machine building)
- ... model of the stress-strain state of the body of the winding of the bobbin hoisting machine with rubber-rope cable. Methodology. Methods of mathematical and computational experiment based on the ...
- Created on 29 October 2018
- 22. The effect of stiffness of shoe brake elements on the distribution of contact pressures
- (Geotechnical and Mining Mechanical Engineering, Machine Building)
- ... for the mine hoisting machines shoe brakes calculating are unreasonably based on the hypothesis in which the brake rim and the brake beam are assumed to be absolutely rigid. Purpose. To develop recommendations ...
- Created on 16 May 2018
- 23. Dynamic optimization of a mine winder acceleration mode
- (Electrical Complexes and Systems)
- ... Dagang, W., Dekun, Z., Zefeng, Z. and Shirong, G., 2012. Effect of various kinematic parameters of mine hoist on fretting parameters of hoisting rope and a new fretting fatigue test. Engineering ...
- Created on 06 September 2017
- 24. Influence of dynamic processes in mine hoists on safety of exploitation of shafts with broken geometry
- (Geotechnical and mining mechanical engineering, machine building)
- ... Substantiation of rational parameters and modes of operation of rescue mobile hoisting plants, PhD. IGTM NAS of Ukraine. Самуся С.В. Обоснование рациональных параметров и режимов эксплуатации аварийноспасательных ...
- Created on 04 August 2016
- 25. Determination of dynamic parameters of dust emission from a coal mine fang
- (Environmental safety, labour protection)
- ... It was stated that the volumes of dust emission from a fang are proportional to one-hour capacity of skip hoisting. The probabilistic assessment of capacity dynamics and dust emission was carried out; ...
- Created on 22 June 2016
- 26. Cross way of steel rope fastening to a single-drum mine hoisting plant with the location of pulleys on the same axis
- (Geotechnical and mining mechanical engineering, machine building)
- ... and Engineering, Dnipropetrovsk, Ukraine. Abstract: Purpose. To study the impact of the methods of steel rope fastening to a single-drum mine hoisting plant with the pulley location on the same ...
- Created on 30 October 2015
- 27. Longitudinal dynamics of mine suspended monorail
- (Geotechnical and mining mechanical engineering, machine building)
- ... and Construction of Transport and Hoisting Machines and Complexes], Veber, Donetsk, Ukraine. Проектування та конструювання транспортних і підіймальних машин та комплексів / [Будішевський В.О., ...
- Created on 29 March 2015
- 28. The theory of multi-layer winding of rubber-rope cable
- (Monographs 2011)
- Zabolotnyy K.S., Panchenko E.V. and Zhupiyev A.L. (2011). The theory of multi-layer winding of rubber-rope cable], monograph, Dnipropetrovsk Mining University, Ukraine, – 151 p. ISBN ...
- Created on 23 April 2013
- 29. Aero-hydro-dynamic experimental research of the properties of the deepwater hydraulic hoist pipeline units
- (Mining)
- ... 2001. – 38 с. Kirichenko, Ye.A. (2001), “Scientific substantiation of parameters of pipe systems for the hydraulic hoisting of minerals”, Abstract of Dr. Sci. (Tech.) dissertation, Mining Machines, National ...
- Created on 26 February 2013
- 30. Comprehensive methodology of calculation of the dynamics of deep-water pump-based hydraulic hoist pumping two-phase compounds
- (Mining)
- ... наук / Кириченко Євген Олексійович; Національна гірнича академія України. – Д., 2001. Kyrychenko Ye.O. Scientific substantiation of pipe system parameters for hydraulic hoisting of minerals: Abstract ...
- Created on 22 November 2012
- 31. Scientific research of torsional hardness of rubber-rope cable of bobbin hoist
- (Geotechnical and mining mechanical engineering, machine building)
- Authors: K.S. Zabolotnyi, Doctor of Technical Science, State Higher Educational Institution “National Mining University”, Professor of Mining Machine and Engineering Department, Dnipropetrovsk, ...
- Created on 21 November 2012
- 32. Advanced method of calculation of deep-water hydraulic hoists and the software
- (Geotechnical and mining mechanical engineering, machine building)
- ... с. 30–33. Kirichenko Ye.A. Scientific substantiation of pipe system parameters for minerals hydraulic hoisting: Abstract of the thesis on receiving of Dr. Sci. (Tech.) degree: speciality 05.05.06 ...
- Created on 21 November 2012
- 33. Methodical maintenance of automatic way of transient regimes control for deep-water airlift hydraulic hoistings
- (Mining)
- ... equipment. The primary result of the research is the mathematical formulation of hydraulic hoisting basic elements: metering device, supply and elevating pipes, mixer, pneumatic pipeline, compressor and ...
- Created on 16 November 2012
- 34. Numerical experiments on determination of maximal stresses of non-reinforcement cut drums of mine winders
- (Geotechnical and mining mechanical engineering, machine building)
- ... – К., 2010. – Вып. 1 (14). – С. 16–21. Zaboblotny, K.S., Zhupiyev, A.L. and Panchenko Ye.V. (2010), “Design of hoisting drums in SolidWorks Simulation”, KPD, Kiev, Ukraine, Issue 1(14), pp. 16–21. ...
- Created on 08 November 2012