Cross way of steel rope fastening to a single-drum mine hoisting plant with the location of pulleys on the same axis

User Rating:  / 0
PoorBest 

Authors:

Т.V. Moskalyova, Cand. Sci. (Tech.), Associate Professor, State Higher Educational Institution “National Mining University”, Senior Lecturer of the Department of Mining Machines and Engineering, Dnipropetrovsk, Ukraine.

M.V. Polushyna, Cand. Sci. (Tech.), Associate Professor, State Higher Educational Institution “National Mining University”, Senior Lecturer of the Department of Mining Machines and Engineering, Dnipropetrovsk, Ukraine.

Abstract:

Purpose. To study the impact of the methods of steel rope fastening to a single-drum mine hoisting plant with the pulley location on the same axis on the minimum distance between the rope strings in static and dynamic regimes.

Methodology. A mathematical model for determining the distance between any points of the steel rope strings in statics has been developed. To study the transverse-longitudinal oscillations of a steel rope string the finite element model of a hoisting plant has been made.

Findings. It was shown that for the cross-method of rope fastening in case when internal deviation angle is smaller than external one the friction between the winding rope and the adjacent rope wrap is excluded. The impact of rope oscillations on the minimum distance between them for the cross-method of fastening ropes was assessed.

Originality. Larger distance between pulleys or the number of empty flutes between the winding up and uncoiling branches on a drum increases the distance between the strings of cross-disposed ropes. A criterion of contact absence between the rope strings for cross fastening was introduced.

Practical value. The cross way of steel rope fastening to a single-drum mine hoisting plant with location of pulleys on the same axis reduces the pitch of winding rope, thereby the rope capacity of a hosting plant and the lift depth are increased

References:

1. Zabolotnyi, K.S., Moskalyova, T.V. and Zhupiev, A.L. (2013), Optimizatsiya po kanatoemkosti proektnykh parametrov barabanov shakhtnykh podyemnykh mashin [Optimization of the Drum Design Parameters of Hoisting Plants by the Rope Capacity], Monograph, National Mining University, Dnipropetrovsk, Ukraine.

Заболотный К.С. Оптимизация по канатоемкости проектных параметров барабанов шахтных подъемных машин: монография /Заболотный К.С., Москалева Т.В. , Жупиев А.Л. – Днепропетровск: Национальный горный университет, 2013. – 152 с.

2. Pravyla bezpeky u vuhilnykh shakhtakh [Safety Regulations for Coal Mines], (1996), Osnova, Kyiv, Ukraine.

Правила безпеки у вугільних шахтах. – К.: Основа, 1996. – 420 с.

3. Zabolotnyi, K.S., Bezpalko, T.V., Polushyna, M.V. (2006), Patent 76865, Ukraine, Mine Single-Drum Hoisting Plant, published on September 15, 2006, Bulletin no.9.

 

Пат. № 76865. Украина. Шахтная однобарабанная подъемная установка / Заболотный К.С. , Безпалько Т.В. , Полушина М.В. (Украина) – Опубл. 15.09.2006, Бюл.  9.

Files:
2015_03_moskalyova
Date 2015-10-29 Filesize 549.45 KB Download 1253

Visitors

7564943
Today
This Month
All days
4225
87429
7564943

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (056) 746 32 79.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home Archive by issue 2015 Contents No.3 2015 Geotechnical and mining mechanical engineering, machine building Cross way of steel rope fastening to a single-drum mine hoisting plant with the location of pulleys on the same axis