- 41. Effect of mutually amplifying action of two coordinate shock loading in problems of dynamics of knots of machines
- (Geotechnical and mining mechanical engineering, machine building)
- ... літератури 1. Ilin, S.R., Samusia, V.I., Ilina, I.S., Ilina, S.S., 2016. Influence of dynamic processes in mine hoists on safety exploitation of shafts with broken geometry. Naukovyi Visnyk Natsіonalnoho ...
- Created on 19 January 2017
- 42. Exergy analysis of waste heat recovery systems of mine compressors
- (Geotechnical and mining mechanical engineering, machine building)
- ... 2013. Experimental investigation of aero-hydroelastic instability parameters of the deepwater hydrohoist pipeline. Middle East Journal of Scientific Research, 18(4), pp. 530–534. 9. Kyrychenko Y.O., ...
- Created on 04 August 2016
- 43. Influence of dynamic processes in mine hoists on safety of exploitation of shafts with broken geometry
- (Geotechnical and mining mechanical engineering, machine building)
- ... Substantiation of rational parameters and modes of operation of rescue mobile hoisting plants, PhD. IGTM NAS of Ukraine. Самуся С.В. Обоснование рациональных параметров и режимов эксплуатации аварийноспасательных ...
- Created on 04 August 2016
- 44. Determination of dynamic parameters of dust emission from a coal mine fang
- (Environmental safety, labour protection)
- ... It was stated that the volumes of dust emission from a fang are proportional to one-hour capacity of skip hoisting. The probabilistic assessment of capacity dynamics and dust emission was carried out; ...
- Created on 22 June 2016
- 45. Cross way of steel rope fastening to a single-drum mine hoisting plant with the location of pulleys on the same axis
- (Geotechnical and mining mechanical engineering, machine building)
- ... and Engineering, Dnipropetrovsk, Ukraine. Abstract: Purpose. To study the impact of the methods of steel rope fastening to a single-drum mine hoisting plant with the pulley location on the same ...
- Created on 30 October 2015
- 46. Longitudinal dynamics of mine suspended monorail
- (Geotechnical and mining mechanical engineering, machine building)
- ... and Construction of Transport and Hoisting Machines and Complexes], Veber, Donetsk, Ukraine. Проектування та конструювання транспортних і підіймальних машин та комплексів / [Будішевський В.О., ...
- Created on 29 March 2015
- 47. The theory of multi-layer winding of rubber-rope cable
- (Monographs 2011)
- Zabolotnyy K.S., Panchenko E.V. and Zhupiyev A.L. (2011). The theory of multi-layer winding of rubber-rope cable], monograph, Dnipropetrovsk Mining University, Ukraine, – 151 p. ISBN ...
- Created on 23 April 2013
- 48. Aero-hydro-dynamic experimental research of the properties of the deepwater hydraulic hoist pipeline units
- (Mining)
- ... Dnipropetrovsk, Ukraine Abstract: Purpose. To choose a rational design of pipeline of deep water hydraulic hoist, which improves its fluidic characteristics to minimize the power consumption ...
- Created on 26 February 2013
- 49. A simulation of the inhibitory process of the shaft multiple-rope hoist equipped with disc brakes
- (Geotechnical and mining mechanical engineering, machine building)
- Authors: M.A. Rutkovskiy It is proposed the model for studying the inhibitory process of the shaft multiple-rope hoist, which makes it possible to determine the rational ...
- Created on 04 January 2013
- 50. On the issue of development of numerical method for calculation of multiphase flows dynamics
- (Poturayev readings. Materials of the All-Ukrainian theoretical and practical conference)
- ... Dnipropetrovsk, Ukrai Annotation: The mathematical basis for the calculation of nonstationary multiphase flows in the pump and airlift-based deep-sea hydrohoist is suggested. The authors ...
- Created on 23 November 2012