- 1. Heuristic control of power consumption by up to 1000 V electrical loads at mining enterprises
- (Content №1 2024)
- ... https://doi.org/10.1109/ACCESS.2020.3005054. 28. Foster, J. D., Berry, A. M., Boland, N., & Waterer, H. (2014). Comparison of Mixed-Integer Programming and Genetic Algorithm Methods for Distributed ...
- Created on 29 February 2024
- 2. Algorithm of the dynamic vehicle weighing system
- (Geotechnical and mining mechanical engineering, machine building)
- ... Based on the analysis of weighing results we adopted the algorithm of the WIM systems. Originality. The optimization algorithm method has been designed, which can improve the measurement accuracy ...
- Created on 05 November 2015
- 3. Automation research performance impact of drilling equipment construction pace openings
- (Mining)
- Authors: A.N. Royenko, Dr. Sci. (Tech.), Professor, State Higher Educational Institution “National Mining University”, Professor of the Department of Construction, Geotechnics and Geomechanics, ...
- Created on 05 November 2015
- 4. Study of influence of explosion on deep layers construction intensity by means of object-oriented programming
- (Geotechnical and mining mechanical engineering, machine building)
- Authors: A.N. Royenko, Dr. Sci. (Tech.), Professor, State Higher Educational Institution “National Mining University”, Professor of the Department of Construction, Geotechnics and Geomechanics, ...
- Created on 29 March 2015