Automation research performance impact of drilling equipment construction pace openings

User Rating:  / 0
PoorBest 

Authors:

A.N. Royenko, Dr. Sci. (Tech.), Professor, State Higher Educational Institution “National Mining University”, Professor of the Department of Construction, Geotechnics and Geomechanics, Dnipropetrovsk, Ukraine.

S.A. Kharin, Dr. Sci. (Tech.), Associate Professor, Regional Municipal Higher Educational Institution “Institute of Business “Strategy”, Professor of the Department of Computer and Informational Technologies, Zhovti Vody, Ukraine.

Abstract:

Purpose. By developing a software, to investigate the influence of the following factors on the speed of construction of extended horizontal workings: performance quotient of an explosive, charge ratio, perimeter blasting technique implementation.

Methodology. The research employed the comprehensive approach that includes the synthesis and analysis of literary sources, theoretical studies based on the methods of mathematical modeling, programming in the Java language.

Findings. The software has been developed for the research. The organizational and technological parameters of the extended horizontal workings drivage in various conditions were studied. The nature of change of pace of mining affected by varying values of the performance quotient of explosives, charge ratio, structure of rocks, and perimeter blasting technique implementation for excavations of various-shape sections.

Originality. It was proved that, in general, the dependence of the rate of penetration on the performance quotient of an explosive, charge ratio are characterized by linear functions. The dependence of placement options of periphery holes and near-periphery holes on the coefficient of rock strength for conditions with f = 10–20. The distance between the hole and the line of least resistance depending on the coefficient of rock strength is described by the logarithmic and exponential functions respectively.

The article shows the results of studies of the perimeter blasting technique effect on the development rate under different conditions: ROP becomes 1.1–1.24 times lower when using the perimeter blasting technique, and the higher is f the more dramatically the development rate falls, which can be explained by the reduced performance of the drilling equipment.

Practical value. A program for calculation of organizational and technological parameters of underground development considering various factors that affect the drilling-and-blasting operations has been created. This may allow us to automate the processes of construction of mines at large depths.

References:

1. Фролов А.А Обоснование рациональных расстояний между цилиндрическими зарядами при их взрывании в скальном массиве горных пород / А.А. Фролов // Вісті Донецького гірничого інституту. – 2013. – №1 (32). – С. 298–303.

Frolov, A.A. (2013), “Validation of rational distances between cylindrical charges during their blasting in rock mass”, Visti Donetskoho Hirnychoho Institutu, no. 1 (32), pp. 298–303.

2. Шашенко А.Н. Критерии оценки устойчивости пород почвы горных выработок / А.Н. Шашенко, А.В. Солодянкин // Науковий вісник Національного гірничого університету. – 2007. – № 1. – С. 44–49.

Shashenko, A.N. and Solodyankin, A.V. (2007), “Criteria of estimation of stability of rock of floor of the main working”, Naukovyi Visnyk Natsionalnoho Hirnychoho Universitetu, no. 1, pp. 44–49.

3. Мартовицький А.В. Обгрунтування комплексу ефективних заходів із підвищення стійкості виробок шахт ПАТДТЕК Павлоградвугілля“/ А.В. Мартовицький // Науковий вісник Національного гірничого університету. – 2012. – № 3. – С. 45–53.

Martovitskiy, A.V. (2012), “Substantiation of an effective set of measures aiming increase of mine workings stability in mines owned by Private Joint-Stock Company “DTEK Pavlogradugol”, Naukovyi Visnyk Natsionalnoho Hirnychoho Universitetu, no. 3, pp. 45–53.

4. Калякин С.А. Управление разрушающим действием взрыва удлиненного шпурового заряда взрывчатого вещества. / С.А. Калякин, А.Н. Шкуматов, К.Н. Лабинский // Вісті Донецького гірничого інституту. – 2013. – №1 (32). – С. 157–164.

Kalyakin, S.A., Shkumatov, A.N., Labinskiy, K.N. (2013), “Driving of cracking ability of explosion of elongated blast-hole charges of explosive”, Visti Donetskoho Hirnychoho Institutu, no. 1 (32), pp. 157–164.

5. Левит В.В. Бурение шахтных стволов как перспективное направление в шахтном строительстве/ В.В. Левит, А.А. Горелкин // Вісник КрНУ. – Кременчук: КДПУ, 2012. – Вип. 2/2012 (73). – C. 104–110.

Lеvit, V.V. and Gorelkin, A.А. (2012), “Drilling of vertical shafts as perspective direction in mine building”, Visnyk Kremenchutskoho Natsionalnoho Universytetu, vol. 2, no. 73, pp. 104–110.

 

 

Files:
2015_04_royenko
Date 2015-11-03 Filesize 488.67 KB Download 1014

Visitors

7350855
Today
This Month
All days
130
40358
7350855

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (056) 746 32 79.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home Archive by issue 2015 Contents No.4 2015 Mining Automation research performance impact of drilling equipment construction pace openings