- 21. Development of digital infrastructure and blockchain in Ukraine
- (Content №6 2023)
- ... justification of stages of the investment project of a mining and processing enterprise. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (3), 159-164. 9. Kulikov, P., Aziukovskyi, O., Vahonova, ...
- Created on 23 December 2023
- 22. Methodology of creation and development of information systems for technological safety of mining facilities
- (Content №6 2023)
- ... to propose a project of step-by-step development of the architecture of information system (IS) of TS, which will contribute to effective integration of digital and mining technologies. To develop a mathematical ...
- Created on 23 December 2023
- 23. Activities efficiency assessment of the governing body’s task force under environmental emergency
- (Content №6 2023)
- ... body’s task force under environmental emergency was applied which allowed determining the degree of its capabilities realization. To study this process, a systematic approach was used, according to which ...
- Created on 23 December 2023
- 24. Assessment of coal mining impact on the geoecological transformation of the Emerald network ecosystem
- (Content №6 2023)
- ... “Samarskyi Lis – UA0000212” caused by coal mining at the section of “Ternivska” mine (Dnipropetrovsk region, Ukraine) using the methods of remote sensing of the Earth in conditions of limited access to ...
- Created on 23 December 2023
- 25. Smart grid projects in the pan-European energy system
- (Content №6 2023)
- ... funded by the H2020 ENERGY and FP7-ENERGY programs. Methodology. As part of the text analysis, the authors evaluated smart grid projects’ results in a sample using text mining methods. Based on statistical ...
- Created on 23 December 2023
- 26. Accounting for a positive, negative and zero sequences power in a three-phase unbalanced electrical system
- (Content №6 2023)
- ... 35-43. https://doi.org/10.15407/techned2017.01.035. 10. Zagirnyak, M. V., Kovalchuk, V. G., & Korenkova, T. V. (2016). Power method of the tasks of determining electrohydraulic complex parameters. ...
- Created on 23 December 2023
- 27. Study of leakage current in underground mine power network: a case study in mining in Vietnam
- (Content №6 2023)
- Authors: Nguyen Truong Giang, orcid.org/0009-0007-4900-5418, Hanoi University of Mining and Geology, Hanoi, the Socialist Republic of Vietnam Do Nhu Y*, orcid.org/0000-0001-6395-2875, Hanoi University ...
- Created on 23 December 2023
- 28. A methodological approach to assessing the durability of welded structures of screens using SolidWorks Simulation software
- (Content №6 2023)
- ... the accuracy of determining the dynamic loads arising during the screen operation, the results of modeling using the SolidWorks Motion program are compared with those obtained by traditional methods using ...
- Created on 23 December 2023
- 29. Mathematical models for determining and analyzing thermal regimes in mining industry mechanism structures
- (Content №6 2023)
- ... Purpose. To develop linear and nonlinear mathematical models of heat conduction for isotropic heterogeneous media with internal heating. This will allow for an increased accuracy in determining temperature ...
- Created on 23 December 2023
- 30. Efficiency and seismic safety of constructing underground structures in complex rock masses
- (Content №6 2023)
- ... for safe seismic ground vibrations which accompany explosions during breaking in mine workings. Methodology. The work used method of analysing mining and geological conditions of workings, field surveys ...
- Created on 23 December 2023
- 31. Analysis and prediction of surface settlements during the digging of underground mining works (Algeria)
- (Content №6 2023)
- Authors: M.A.R.Morsli*, orcid.org/0000-0001-5242-986X, LAVAMINE Laboratory,Mining Department, Faculty of Earth Sciences, Badji Mokhtar University, Annaba, Algeria, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. ...
- Created on 23 December 2023
- 32. Problems of operating heating boilers of increased environmental efficiency
- (Content №6 2023)
- Authors: N.M.Fialko, orcid.org/0000-0003-0116-7673, Institute of Engineering Thermophysics of National Academy of Sciences of Ukraine, Kyiv, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. R.O.Navrodska*, orcid.org/0000-0001-7476-2962, ...
- Created on 23 December 2023
- 33. Recycling of barite ore tailings into porcelain: microstructure and dielectric properties
- (Content №6 2023)
- ... Maouche, S., ..., & Boutaleb, A. (2017). Soil metal pollution from former Zn–Pb mining assessed by geochemical and magnetic investigations: case study of the Bou Caid area (Tissemsilt, Algeria). Environmental ...
- Created on 23 December 2023
- 34. Data analysis solutions to improve blasting efficiency in mining
- (Content №6 2023)
- Authors: Dao Hieu, orcid.org/0009-0009-4994-7784, Hanoi University of Mining and Geology, Hanoi, the Socialist Republic of Vietnam Pham Thanh Loan*, orcid.org/0000-0002-8933-5258, Hanoi University ...
- Created on 23 December 2023
- 35. Mathematical substantiation and creation of information tools for optimal control of drilling and blasting in open-pit mine
- (Content №6 2023)
- ... the informational infrastructure necessary for effectively managing drilling and blasting operations in open-pit mining of rock deposits. To define the distribution function of natural rock blocks within ...
- Created on 23 December 2023
- 36. Managing the process of underground coal gasification
- (Content №6 2023)
- ... occurrence according to the mining-geological conditions of its occurrence. When determining the gasification process efficiency, two methods of supplying the blast mixture are tested: through a blast ...
- Created on 23 December 2023
- 37. Use of backscattering ultrasound parameters for iron ore varieties recognition
- (Content №6 2023)
- ... explosive charge in an inorganic medium. Metallurgical and Mining Industry, 7(8), 564-567. 4. Golik, V., Morkun, V., Morkun, N., & Gaponenko, I. (2018). Improvement of hole drilling technology for ...
- Created on 23 December 2023
- 38. Theoretical model of random freight flow distribution in the conveyor transport line of the coal mine
- (Content №6 2023)
- ... limit for conveyor transport lines along horizontal and inclined preparatory workings of mining areas (2.0). Reliable initial data on the variation of the random freight flow in the conveyor transport ...
- Created on 23 December 2023
- 39. Substantiation of the technological parameters of bucket-wheel excavator forward trench when mining titanium deposits
- (Content №6 2023)
- ... out an advanced overburden bench by a bucket-wheel excavator, to reduce the cost of overburden work at Pit 7 of Vilnohirsk Mining and Metallurgical Plant. Methodology. Setting the parameters of the technological ...
- Created on 23 December 2023
- 40. Analysis of the input material flow of the transport conveyor
- (Content №5 2023)
- ... analysis based on the decomposition of the input material flow for a conveyor section has been proposed, which, unlike the existing methods of input flow typing for the mining industry, will allow us to ...
- Created on 27 October 2023