Articles

Improvement of the method for standardizing the duration of rail cars shunting

User Rating:  / 0
PoorBest 

Authors:


D.M.Kozachenko, orcid.org/0000-0003-2611-1350, Dnipro National University of Railway Transport named after Academician V.Lazaryan, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

B.V.Gera, orcid.org/0000-0002-5413-5176, Dnipro National University of Railway Transport named after Academician V.Lazaryan, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

E.K.Manafov, orcid.org/0000-0001-5697-577X, Azerbaijan Technical University, Baku, the Republic of Azerbaijan, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

A.V.Gorbova, orcid.org/0000-0002-5612-2715, Dnipro National University of Railway Transport named after Academician V.Lazaryan, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

R.G.Korobyova, orcid.org/0000-0002-6424-1079, Dnipro National University of Railway Transport named after Academician V.Lazaryan, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.


повний текст / full article



Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu. 2021, (6): 158 - 164

https://doi.org/10.33271/nvngu/2021-6/158



Abstract:



Purpose.
To improve the method for calculating the time standard for shunting cars from track to track in order to take into account the local operating conditions of railway stations and railway sidings.


Methodology.
During the research, the methods of theory of railway operation were used. The problem of calculating the time standard for shunting operation was solved as the problem of searching the optimal division of train set into the car groups to achieve minimal time consumption for shunting operation.


Findings.
In the course of the study, the methods for calculating the time standards for initial and final operations, as well as movements performed when shunting cars from track to track were improved. It was proved that the minimum time spent on shunting cars from track to track was achieved when the train set was divided into the minimum possible number of parts and the cars were shunted in the longest possible groups and one remaining group. It was also established that with sufficient accuracy for engineering problems the duration of shunting train set from track to track can be represented by the piecewise linear function of the car number in it.


Originality.
The work originality consists in improving the method for calculating the time standard for shunting cars from track to track, that, unlike the existing one, takes into account the length limitations of the car groups being shunted from track to track, as well as the actual composition of operations performed in the process of shunting.


Practical value.
The use of the developed method allows setting time standards for shunting cars from track to track, taking into account the local operating conditions of railway stations and sidings of industrial enterprises. The method also makes it possible to simplify solving problems of searching the optimal order of performing more complex shunting operations, such as sorting cars into several tracks, collecting cars on one track, train formation, and others.



Keywords:
railway transport, railway station, railway siding, shunting operation, standardization

References:


1. Boysen, N., Fliedner, M., Jaehn, F., & Pesch, E. (2012). Shunting yard operations: Theoretical aspects and applications. European Journal of Operational Research, 220(1), 1-14. https://doi.org/10.1016/j.ejor.2012.01.043.

2. Jaehn, F., Otto, A., & Seifried, K. (2018). Shunting operations at flat yards: retrieving freight railcars from storage tracks. OR Spectrum, 40(2), 367-393. https://doi.org/10.1007/s00291-017-0495-x.

3. Belosevic, I., & Ivic, M. (2018). Variable neighborhood search for multistage train classification at strategic planning level. Computer-Aided Civil and Infrastructure Engineering, 33(3), 220-242. https://doi.org/10.1111/mice.12304.

4. Kozachenko, D., Bobrovskiy, V., Gera, B., Skovron, I., & Gorbova,A. (2021). An optimization method of the multi-group train formation at flat yards. International Journal of Rail Transportation, 9(1), 61-78. https://doi.org/10.1080/23248378.2020.1732235.

5. Kozachenko, D., Bobrovskyi, V., Skovron, I., & Jablonskyte, J. (2019). Improving the efficiency of multi-group trains formation. In Proceedings of 23rd International Scientific Conference, 3, 1083-1089. Retrieved from https://transportmeans.ktu.edu/wp-content/uploads/sites/307/2018/02/Transport-means-2019-Part-3.pdf.

6. Skalozub, V.V., Ilman, V.M., & Bilyi, B.B. (2020). Constructive multi-layer models for ordering a set of sequences, taking into account the complexity operations of formation. Science and transport progress, 4(88), 61-76. Retrieved from http://stp.diit.edu.ua/article/view/213232.

7. Zagorskikh, A., Alsova, O., & Gavrilov, A. (2020). A simulation model of the process of organizing the movement and maintenance of trains at a Railway Station. Journal of Physics: Conference Series 1661 012200. https://doi.org/10.1088/1742-6596/1661/1/012200.

8. Rusca, A., Popa, M., Rosca, E., Rosca, M., Dragu, V., & Rusca, F. (2016). Simulation model for port shunting yards. IOP Conference Series: Materials Science and Engineering, 145, 082003. https://doi.org/10.1088/1757-899X/145/8/082003.

9. Naumov, V., Taran, I., Litvinova, Y., & Bauer, M. (2020). Optimizing resources of multimodal transport terminal for material flow service. Sustainability, 12(16), 6545. https://doi.org/10.3390/su12166545.

10. Nechay, T., Roganov, V., Zhashkova, T., Chirkina, M., Lavendels,J., & Korop, G. (2019). Improvement of operational planning for shunting service on non-public railway lines. IOP Conference Series: Earth and Environmental Science, 378012026. https://doi.org/10.1088/1755-1315/378/1/012026.

11. Kozachenko, D.M., Verlan, A.I., & Korobiova, R.H. (2021). Development of Analytical Methods for Calculating Time Standards for Shunting Operations. Science and transport progress, 1(91), 51-64. https://doi.org/10.15802/stp2021/228097.

12. Lashenyh, O., Turpak, S., Gritcay, S., Vasileva, L., & Ostroglyad,E. (2016). Development of mathematical models for planning the duration of shunting operations. Eastern-European Journal of Enterprise Technologies, 5/3(83), 40-46. https://doi.org/10.15587/1729-4061.2016.80752.

13. Falendysh, A., Kharlamov, P., Kletska, O., & Volodarets, N. (2016). Calculation of the parameters of hybrid shunting locomotive. Transport Research Procedia, 14, 665-671. https://doi.org/10.1016/j.trpro.2016.05.325.

14. Samorodov, V., Bondarenko, A.,Taran, I., & Klymenko, I. (2020). Power flows in a hydrostatic-mechanical transmission of a mining locomotive during the braking process. Transport Problems, 15(3), 17-28. https://doi.org/10.21307/tp-2020-030.

15. Kuznetsov, V., Lyubarskyi, B., Kardas-Cinal, E., Yeritsyan, B., Riabov, I., & Rubanik, I. (2020). Recommendations for the selection of parameters for shunting locomotives. Archives of Transport, 56(4), 119-133. https://doi.org/10.5604/01.3001.0014.5650.

 

Visitors

7559399
Today
This Month
All days
3820
81885
7559399

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (056) 746 32 79.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home