Optimisation of the pitedges parameters at the open mine working
Authors: Lituchyi V.V.
The solution of important scientific and technical problems of efficiency increase and decrease in ecological consequences of open-cast mining of horizontal deposits by optimisation of parameters pitedges, providing reduction of volumes overburden works and the areas, the residual developed spaces of open-cast mines is stated. Optimum parameters of a board of an open-cast mine are by means of special, offered by the author, iterative algorithm.
Files:
2010_4 Letuchij | |
2012-12-14 545.63 KB 1277 |
Newer news items:
- Results of the 3-d simulation of the transversaly isotopic rock mass stress state around a longwall - 24/12/2012 16:11
- The subsidences angular parameters analysis on the western donbass mines - 24/12/2012 15:40
- Substantiation of the tendencies of metal consumption decrease for frame-anchor support of a seam opening in layered massif of weak rocks - 24/12/2012 15:38
- By question about affecting environment of emulsive explosives with solid propellant products is proved in blasting operations - 24/12/2012 15:37
- Influence of technogenic zones of long well the field on the is intense-deformed condition of containing breeds ahead of the clearing face - 24/12/2012 15:35
- Research of forming of dynamic protective area on border of the destroyed array - 24/12/2012 15:33
- Mine process control in emergency situations by information system, based on control of the massif state - 24/12/2012 15:32
- Investigation of stress and strain condition area around mining cameras - 24/12/2012 15:30
- Research of development of slopes of a surface at formation surface subsidence - 24/12/2012 15:28
- Determination of filling parameters for protective stripes of variable rigidity at the combined system of development of declivous coal seams on deep horizons - 24/12/2012 15:26