Abstract:

Foreign and Ukrainian experience of application of modern roof bolting technology during mining shows that it provides stability and reliability of tunnels for continuous service in different use environment. One of the requirements of roof bolting installation is mounting it in loaded by rock pressure enclosing rock massif in immediate vicinity of coal face. It allows best preservation of natural monolithic state of marginal rock due to involvement of installed roof bolting into rock pressure resistance work. When the excavation is carried by means of mining combine, it is easy to install another row of anchors in time because destruction of the roof rocks is minimal and work gives the necessary effect. But in case of blast-hole drilling, excavation work breaks natural monolithic rock. Determination of the stress field around the coal face before, during and after explosion of blast-hole charges will allow estimation of the impact of the explosion on the stability of roof bolting and its ability to keep roof rocks in an undisturbed state. Thus the purpose of the research was the study of state the roof rocks fixed by the roof bolting in en excavation made by method of blast-hole drilling by means of mathematical modeling and mining experiments and observations data analysis. The article presents the results of numerical modeling of geomechanical and filtration processes around the mine working fixed by the roof bolting during explosion of blast-hole charges. The state of unfixed roof over the coal face with different delays of roof bolting installation from the coal face was done. It is shown, that roof bolting prevents rock foliation and destruction of the roof rocks even in en excavation made by method of blast-hole drilling.

References:

1. Булат А.Ф. Опорно-анкерное крепление горных выработок угольных шахт / А.Ф. Булат, В.В. Ви-ноградов / Ин-т геотехнической механики НАН Украины. – Днепропетровск: 2002. – 372 с.

Bulat, A.F. and Vinogradov, V.V. (2002), Oporno-ankernoe kreplenie gornykh vyrabotok ugolnykh shakht [Roof Bolting in Mine Workings of Coal Mines], Institute of Geotechnical Mechanics NAS of Ukraine, Dnepropetrovsk, Ukraine, 372 p.

2. Система забезпечення надійного та безпечного функціонування гірничих виробок із анкерним кріпленням. Загальні технічні вимоги. – К.: Мінвуглепром України, 2008. – 83 с.

“System of providing reliable and safe operation in the mine workings by means of roof bolting. The general technical requirements”, (2008), Ministry of coal industry of Ukraine, Kyiv, Ukraine, 83 p.

3. Ефремов Э.И. Взрывное разрушение выбросоопасных пород в глубоких шахтах. / Э.И. Ефремов, В.Н. Харитонов, И.А. Семенюк – М.: Недра – 256 с.

Yefremov, E.I., Haritonov, V.N. and Semenyuk, I.A. Vzryvnoe razrushenie vybrosoopasnykh porod v glubokikh shakhtakh [Explosive Destruction of Outburst-Prone Rock in Deep Mines], Nedra, Moscow, Russia, 256 p.

4. Боровиков В.А. Моделирование действия взрыва при разрушении горных пород. / В.А. Боровиков, И.Ф. Ванягин – М.: Недра, 1990. – 231 с.

Borovikov, V.A. and Vanyagin, I.F. (1990), Modelirovanie deystvia vzryva ghb hfpheitybb gornykh porod [Modeling of Blast Action During Destruction of Rocks], Nedra, Moscow, Russia, 231 p.

Files:
2012_01_krukov
Date 2013-02-18 Filesize 614.91 KB Download 1173

Visitors

7564942
Today
This Month
All days
4224
87428
7564942

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (056) 746 32 79.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home Archive by issue 2012 Contents No.1 2012 Mining Research of the stress condition of massif around mine working with bolting at the drive working by blast-hole drilling