Articles
Modeling of drilling water supply wells with airlift reverse flush agent circulation
- Details
- Category: Content №1 2023
- Last Updated on 25 February 2023
- Published on 30 November -0001
- Hits: 2864
Authors:
M.T.Biletskiy, orcid.org/0000-0002-4947-5686, Satbayev University, Almaty, the Republic of Kazakhstan
B.T.Ratov*, orcid.org/0000-0003-4707-3322, Satbayev University, Almaty, the Republic of Kazakhstan, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
A.K.Sudakov, orcid.org/0000-0003-2881-2855, Dnipro University of Technology, Dnipro, Ukraine; Lviv Polytechnic National University, Lviv, Ukraine
D.А.Sudakova, orcid.org/0000-0002-8676-4006, Ivano-Frankivsk National Technical University of Oil and Gas, Ivano-Frankivsk, Ukraine
B.R.Borash, orcid.org/0000-0001-9898-392X, Yessenov University, Aktau, the Republic of Kazakhstan
* Corresponding author e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu. 2023, (1): 053 - 060
https://doi.org/10.33271/nvngu/2023-1/053
Abstract:
Purpose. Determination of the influence of mining and geological conditions of drilling hydrogeological wells with backwash on the technological parameters of the airlift method of cleaning it from drilled rock and the properties of the ascending flow of aerated washing liquids.
Methodology. The tasks were solved by a complex research method, including analysis and generalization of literary and patent sources, analytical, experimental studies, using computer and mathematical modeling methods.
Findings. An algorithm for the functioning of the airlift circulation method during rotary drilling with backwash has been developed. The algorithm takes into account: hydrostatic and hydrodynamic pressures, and the effect on them of the rate of drilling of the well; the effect of the sludge content in the upstream. The effective values of the airflow rate, the density of the water-air mixture and the velocity of its upward flow are established. A method for estimating the effective values of technological parameters and their changes in the upward flow of the mixture is proposed. A model has been developed that allows analyzing the dependences of the air flow rate, the density of the mixture and the rate of its ascent on the parameters of the well being drilled. The model is applied to typical drilling conditions of a large-diameter water intake well at the Samskoye groundwater deposit on the Mangystau peninsula.
Originality. A mathematical algorithm has been developed for the functioning of the airlift backwash method when drilling large-diameter water intake wells. The method is based on the analysis of the pressure balance in the descending and ascending flows of the washing agent. For the case of backwash, a formula for estimating the content of sludge in it was obtained. A method has been developed for determining the average effective density of the mixture in terms of the height of the well, as well as the air content in it. Based on the average effective values, a method is proposed for estimating changes in the density of the mixture, its flow rate and velocity along the upward flow.
Practical value. The proposed algorithm is the basis of a computer model that allows you to determine the dependences of the values of the density of the mixture, the content of air and sludge in it and the rate of ascent, from the depth of the well, the depth of the mixer descent, the speed of deepening, the specified velocity of the upward fluid flow, as well as the diameters of the well and drill pipes. Specific modeling results have been obtained in relation to the Samskoye groundwater deposit of the Mangystau peninsula.
Keywords: peninsula, Mangystau, hydrogeological well, reverse flushing, airlift method
References.
1. Sadovenko, I., Inkin, O., Dereviahina, N., & Khryplyvets, Y. (2019). Actualization of prospects of thermal usage of groundwater of mines during liquidation. E3S Web of Conferences 123, Ukrainian School of Mining Engineering, 01046, 1-9. https://doi.org/10.1051/e3sconf/201912301046.
2. Rudakov, D., Inkin, O., Dereviahina, N., & Sotskov, V. (2020). Effectiveness evaluation for geothermal heat recovery in closed mines of Donbas. E3S Web of Conferences 201, 01008, Ukrainian School of Mining Engineering, 1-10. https://doi.org/10.1051/e3sconf/202020101008.
3. Committee on Water Resources of the Ministry of Agriculture of the Republic of Kazakhstan. Concept of water supply of Mangystau region (2012).
4. Kryzhanivskyi, Ye. I., Vytyaz, O. Yu., Tyrlych, V. V., Hrabovskyy, R. S., & Artym, V. I. (2021). Evaluation of the conditions of drill pipes failure during tripping operations. SOCAR Proceedings, 1, 36-48. https://doi.org/10.5510/OGP20210100478.
5. Sudakov, А., Dreus, A., Sudakovа, D., & Khamininch, О. (2018). The study of melting process of the new plugging material at thermomechanical isolation technology of permeable horizons of mine opening. E3S Web of Conferences, 60, 1-10. https://doi.org/10.1051/e3sconf/20186000027.
6. Vytyaz, O., Hrabovskyy, R., Artym, V., & Tyrlych, V. (2020). Effect of geometry of internal crack-like defects on assessing trouble-free operation of long-term operated pipes of drill string. Metallofizika i Noveishie Tekhnologii, 42(12), 1715-1527. https://doi.org/10.15407/mfint.42.12.1715.
7. Pavlychenko, A. V., Ihnatov, A. O., Koroviaka, Ye. A., Ratov, B. T., & Zakenov, S. T. (2022). Problematics of the issues concerning development of energy-saving and environmentally efficient technologies of well construction. ICSF-2022. IOP Conference. Series: Earth and Environmental Science, 1049. 012031.
8. Ihnatov, A., Koroviaka, Ye., Rastsvietaiev, V., & Tokar, L. (2021). Development of the rational bottomhole assemblies of the directed well drilling. Gas Hydrate Technologies: Global Trends, Challenges and Horizons – 2020. E3S Web of Conferences, 230, 01016. https://doi.org/10.1051/e3sconf/202123001016.
9. Femyak, Ya. M., Femiak, V. Ya., Kovbsiuk, I. M., Martsynkiv, O. B., & Vytvytskyy, I. I. (2019). Evaluation of the influence of geological-technical factors on the durability of casing columns in oil and gas wells. XIII International Scientific Conference “Monitoring of Geological Processes and Ecological Condition of the Environment”.
10. Femyak, Ya. M., Riznychuk, A. I., Fedoriv, V. V., Charkovskyi, V. M., Deineha, R. O., & Stetsiuk, R. B. (2021). Technical and technological solutions to prevent destruction of the walls of directional wells in the mining and geological conditions of Ukrainian fields. XV International Scientific Conference “Monitoring of Geological Processes and Ecological Condition of the Environment”. https://doi.org/10.3997/2214-4609.20215K2041.
11. Melnychenko, Y., Poberezhny, L., Hrudz, V., Chudyk, I., & Dodyk, T. (2021). Determination of preconditions leading to critical stresses in pipeline during lowering. Lecture Notes in Civil Engineering, 102, 241-252. https://doi.org/10.1007/978-3-030-58073-5_19.
12. Chudyk, I., Raiter, P., Grydzhuk,Ya., & Yurych, L. (2020). Mathematical model of oscillations of a drill tool with a drill bit of cutting-scraping type. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (1), 52-57. https://doi.org/10.33271/nvngu/2020-1/052.
13. Pogrebnyak, A., Chudyk, I., Pogrebnyak, V., & Perkun, I. (2019). Coil-uncoiled chain transition of polyethylene oxide solutions under convergent flow. Chemistry and Chemical Technology, 13(4), 465-470. https://doi.org/10.23939/chcht13.04.465.
14. Kryzhanivskyi, E. І., Nykyforchyn, H. М., Student, О. Z., Krechkovska, H. V., & Chudyk, І. І. (2020). Role of Nonmetallic Inclusions in Premature Stress-Corrosion Fractures of Drill Pipes. Materials Science, 55(6), 822-830. https://doi.org/10.1007/s11003-020-00375-4.
15. Kovbasiuk, I. M., Martsynkiv, O. B., Femiak, Y. M., Vytvytskyi, I. I., & Zhdanov, Y. D. (2020). Research of the stressed state of saline rocks of prykarpattia deposits under the influence of thermobaric conditions. Paper presented at the XIV International Scientific Conference on Monitoring of Geological Processes and Ecological Condition of the Environment. https://doi.org/10.3997/2214-4609.202056048.
16. Chernova, M., & Kuntsiak, Ya. (2021). The concept of application of oscillation energy in modern technologies of directional drilling. E3S Web of Conferences, 230, 01017. https://doi.org/10.1051/e3sconf/202123001017.
17. Ziaja, J., Stryczek, S., Jamrozik, A., Knez, D., Czarnota, R., & Vytyaz, O. (2017). Sealing slurries limiting natural gas exhalations from the annular space of a wellbore. Przemysl Chemiczny, 96(5), 990-992. https://doi.org/10.15199/62.2017.5.9.
18. Ovetska, O., Ovetskyi, S., & Vytiaz, O. (2021). Conceptual principles of project management for development of hydrate and other unconventional gas fields as a component of energy security of Ukraine. E3S Web of Conferences, 230, 01021. https://doi.org/10.1051/e3sconf/202123001021.
19. Sudakov, А., Dreus, A., Kuzin, Y., Sudakova, D., Ratov, B., & Khomenko, O. (2019). A thermomechanical technology of borehole wall isolation using a thermoplastic composite material. E3S Web of Conferences, 109, 00098. Essays of Mining Science and Practice. https://doi.org/10.1051/e3sconf/201910900098.
20. Fedorov, B., Ratov, B., & Sharauova, A. (2017). Development of the model of petroleum well boreability with PDC bore bits for Uzen oil field (the Republic of Kazakhstan). Eastern-European Journal of Enterprise Technologies, 16-22. https://doi.org/10.15587/1729-4061.2017.99032.
Newer news items:
- Reducing external air leakage at the main ventilation unit of the mine - 25/02/2023 01:06
- Minimization of power fluctuations of wind power plants when constructed in exclusion zones of enterprises - 25/02/2023 01:06
- Mathematical model of the closed-loop system of excavator bucket positioning - 25/02/2023 01:06
- Increasing the energy efficiency of modes of distribution networks with photovoltaic stations - 25/02/2023 01:06
- Load of a semi-car having the dismountable roof of composites - 25/02/2023 01:06
- Analysis of surface settlements induced by tunnel excavation with EPB-TBM - 25/02/2023 01:06
- Features of modernization of a truck with a hybrid power transmission - 25/02/2023 01:05
- Geometry variation of ballasted railway tracks due to weather conditions - 25/02/2023 01:05
- Graphitizing modification of the axial zone of cast iron rolling rolls in the liquidus-solidus temperature range - 25/02/2023 01:05
- Reverse flotation process in double stage on the Algerian phosphate ore treatment - 25/02/2023 01:05
Older news items:
- Geomechanical substantiation of parameters for safe completion of mining the coal reserves adjacent to main workings - 25/02/2023 01:05
- Pressure distribution in the oil reservoir in a two-dimensional plane - 25/02/2023 01:05
- Predicting underground mining impact on the earth’s surface - 25/02/2023 01:05
- Peculiarities of the formation of the Zhailma volcano-tectonic deep - 25/02/2023 01:05
- Algorithm for the formation of price lists for raw amber taking into account individual consumer characteristics - 25/02/2023 01:05
- Lithium and gold content in salt domes and saline lands of Western and Southern Kazakhstan - 25/02/2023 01:05
- Method for determining the ultimate sorption capacity of coal matter by EPR-spectroscopy - 25/02/2023 01:05