Geotechnical and mining mechanical engineering, machine building


Warning: strpos() [function.strpos]: Empty needle in /home/nvnguinu/public_html/templates/ja_purity_ii/html/com_content/category/default_articles.php on line 83

Warning: strpos() [function.strpos]: Empty needle in /home/nvnguinu/public_html/templates/ja_purity_ii/html/com_content/category/default_articles.php on line 83

Warning: strpos() [function.strpos]: Empty needle in /home/nvnguinu/public_html/templates/ja_purity_ii/html/com_content/category/default_articles.php on line 83

Warning: strpos() [function.strpos]: Empty needle in /home/nvnguinu/public_html/templates/ja_purity_ii/html/com_content/category/default_articles.php on line 83

Warning: strpos() [function.strpos]: Empty needle in /home/nvnguinu/public_html/templates/ja_purity_ii/html/com_content/category/default_articles.php on line 83

Warning: strpos() [function.strpos]: Empty needle in /home/nvnguinu/public_html/templates/ja_purity_ii/html/com_content/category/default_articles.php on line 83

Warning: strpos() [function.strpos]: Empty needle in /home/nvnguinu/public_html/templates/ja_purity_ii/html/com_content/category/default_articles.php on line 83

Warning: strpos() [function.strpos]: Empty needle in /home/nvnguinu/public_html/templates/ja_purity_ii/html/com_content/category/default_articles.php on line 83

Warning: strpos() [function.strpos]: Empty needle in /home/nvnguinu/public_html/templates/ja_purity_ii/html/com_content/category/default_articles.php on line 83
Determination of instantaneous temperature in the cutting zone during abrasive processing
Study on the interaction of the rock massive and support setting of tunnels
Deformation of the long casing string on centralizers in the process of its installation in a horizontal well
Substantiation of rational drive parameters for reliable operation of heavy-loaded mechanisms
Mathematical modeling in the calculation of reinforcing elements
Determination of stress in composite plates with cracks on the basis of the method of integral equations and solutions by Green
Vibration platform for forming large-sized reinforced concrete products
Determination of static equilibrium conditions of a mobile terrestrial robotic complex
Comparative analysis of transmissions of mine diesel ­locomotives with different component schemes






Visitors

7352717
Today
This Month
All days
79
42220
7352717

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (056) 746 32 79.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home Innovative projects EngCat Archive 2019 Contens №5 2019 Geotechnical and mining mechanical engineering, machine building