- 41. Stochastic models of work and rest schedules
- (Content №1 2024)
- Authors: A.P.Bochkovskyi*, orcid.org/0000-0002-4166-3148, Odesa Polytechnic National University, Odesa, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. * Corresponding author e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. ...
- Created on 29 February 2024
- 42. Enhancement of sorption of the azoic dye (Azucryl Red) by natural and calcined hyper-aluminous kaolins
- (Content №1 2024)
- ... (France) in natural and calcined states. Methodology. Batch interactive parameter pH, pHpzc contact time, dye concentration, adsorbent loading and temperature are taken to obtain optimums for the AR ...
- Created on 29 February 2024
- 43. Method of controlling the volume of combustion products at different boiler loads
- (Content №1 2024)
- ... Abstract: Purpose. Development of a method for controlling the volume of combustion products at different load of boiler equipment. Achieving the objective may allow controlling the flue gas temperature ...
- Created on 29 February 2024
- 44. An overview of hydrogen production via reforming from natural gas
- (Content №1 2024)
- Authors: Duyen Quang Le*, orcid.org/0000-0001-6953-4762, Faculty of Petroleum and Energy, Hanoi University of Mining and Geology, Hanoi, the Socialist Republic of Vietnam, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. ...
- Created on 29 February 2024
- 45. Heuristic control of power consumption by up to 1000 V electrical loads at mining enterprises
- (Content №1 2024)
- ... with iron ore underground mining methods. This enables direct control of the load connection to the industrial power grid to ensure minimum power costs depending on its cost per day ahead. Methodology. ...
- Created on 29 February 2024
- 46. Justification of geodetic monitoring methodology of the retaining walls on the example of the embankment in Kremenchuk
- (Content №1 2024)
- ... for the design of retaining walls (2017). Retrieved from https://dbn.co.ua/load/normativy/dstu/b_v_2_1_31/5-1-0-1761. 18. DBN V.2.4-3:2010. Hydraulic structures. Main provisions (n.d.). Retrieved from ...
- Created on 29 February 2024
- 47. Heat exchange under the longitudinal movement of wet steam in finning heat exchangers
- (Content №1 2024)
- Authors: V.O.Tuz, orcid.org/0000-0002-4691-4890, National Technical University of Ukraine “Igor Sikorsky Kyiv Polytechnic Institute”, Kyiv, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. N.L.Lebed*, orcid.org/0000-0002-2194-4911, ...
- Created on 29 February 2024
- 48. Testing the fragmentation of railway ballast material by laboratory methods using Proctor compactor
- (Content №1 2024)
- ... so-called shock loads from above, similar to railway loading conditions. Unlike the standard method, the andesite material was placed in a standard cylinder in these tests. The samples were pre-screened ...
- Created on 29 February 2024
- 49. Advantages of using CONCRETE CANVAS materials in railway track construction
- (Content №1 2024)
- ... studies, using computer and mathematical modeling methods. Tests were conducted with and without the CC layer in a multi-level shear box. After the shear test, the specimens were also tested for load-bearing ...
- Created on 29 February 2024
- 50. Scientific bases and peculiarities of conversion of CHPP anthracite boilers to sub-bituminous coal combustion
- (Content №1 2024)
- ... Retrieved from http://www.ceti-nasu.org.ua/upload/iblock/8a2/8a29ea5c807579c50f0b4755740a37cf.pdf. 4. Dipak K. Sarkar (2015). Thermal power plant: Design and Operation. Elsevier Inc. https://doi.org/10.1016/B978-0-12-801575-9.00001-9. ...
- Created on 29 February 2024