- 21. Electric vehicle energy consumption taking into account the route topology
- (Content №2 2024)
- ... Qi, X., Wu, G., Boriboonsomsin, K., & Barth, M. (2017). Data-driven decomposition analysis and estimation of link-level electric vehicle energy consumption under real-world traffic conditions. Transportation ...
- Created on 01 May 2024
- 22. Cable line equivalent circuit parameters determination using the instantaneous power components
- (Content №2 2024)
- ... https://doi.org/10.1109/APPEEC45492.2019.8994452. 4. Ghosh, R., Seri, P., & Montanari, G. (2021). Partial discharge measurements and life estimation in DC electrical insulation during voltage transients ...
- Created on 01 May 2024
- 23. Drilling wells taking into account the dynamic properties of rocks
- (Content №2 2024)
- ... hydrovibrator. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (3), 31-37. https://doi.org/10.33271/nvngu/2021-3/031. 18. Zhulay, Yu., Nikolayev, O., & Kvasha, Yu. (2022). Estimation of the ...
- Created on 01 May 2024
- 24. Formation of prospecting criteria for copper-porphyry deposits based on the construction of reference models
- (Content №2 2024)
- ... 744. https://doi.org/10.3390/min12060744. 6. Rudko, G. I., Myatchenko, A. V., Isataeva, F. M., & Portnov, V. S. (2018). Geological-economic estimation of Kazakhstan deposits. Sustainable Development ...
- Created on 01 May 2024
- 25. Three-dimensional density model of the mantle beneath the Ukrainian shield
- (Content №2 2024)
- ... Estimation of resolution and covariance for large matrix inversion. Geophysical Journal International, 121, 409-426. https://doi.org/10.1111/j.1365-246X.1996.tb01548.x. 13. Kurlov, N. S., Sheremet, E. M., ...
- Created on 01 May 2024
- 26. Gross regional product in Ukraine: two-dimensional analysis of regularities and territorial features
- (Content №1 2024)
- ... and estimation of spatial panel data models. International Regional Science Review, 26(3), 244-268. https://doi.org/10.1177/0160017603253791. 9. Petersen, T. (2014). Analyzing Panel Data: Fixed- and ...
- Created on 29 February 2024
- 27. Improvement of the method of time rationing for assembling car groups on one track
- (Content №1 2024)
- ... of a method for searching the optimal order of assembling cars on one track; distribution parameters estimation of the random value of the duration of shunting operation of assembling cars on one track ...
- Created on 29 February 2024
- 28. An overview of hydrogen production via reforming from natural gas
- (Content №1 2024)
- ... system analysis. Applied Energy, 165, 183-201. https://doi.org/10.1016/j.apenergy.2015.11.047. 42. Alhamdani, Y. A., Hassim, M. H., Ng, R. T., & Hurme, M. (2017). The estimation of fugitive gas emissions ...
- Created on 29 February 2024
- 29. Testing the fragmentation of railway ballast material by laboratory methods using Proctor compactor
- (Content №1 2024)
- ... of rocks assessed by micro-Deval tests and estimation of the abrasion process of rock types based on strength parameters. Engineering Geology, 282, 105996. https://doi.org/10.1016/j.enggeo.2021.105996. ...
- Created on 29 February 2024
- 30. Advantages of using CONCRETE CANVAS materials in railway track construction
- (Content №1 2024)
- ... 89-100. https://doi.org/10.5604/01.3001.0009.7389. 6. Czinder, B., Vásárhelyi, B., & Török, Á. (2021). Long-term abrasion of rocks assessed by micro-Deval tests and estimation of the abrasion process ...
- Created on 29 February 2024
- 31. Dual form of education within the framework of contemporary educational trends in Ukraine
- (Content №6 2023)
- ... 15. Rayter, G., & Davlikanova, O. (2017). Introduction of Dual Education in Ukrainian Higher Educational Establishments and Approaches to Estimation of its Economic Benefits. Business Ethics and ...
- Created on 23 December 2023
- 32. Assessment of coal mining impact on the geoecological transformation of the Emerald network ecosystem
- (Content №6 2023)
- ... Communities in an Urban River (Central Europe). Water Air Soil Pollution, 231, 5. https://doi.org/10.1007/s11270-019-4373-9. 10. Pavlychenko, А., & Kulikova, D. (2016). Estimation of ecological state ...
- Created on 23 December 2023
- 33. Data analysis solutions to improve blasting efficiency in mining
- (Content №6 2023)
- ... Chandra, G. R. (2016). Signal processing computation based seismic energy estimation of blast induced ground vibration waves. IEEE Distributed Computing, VLSI, Electrical Circuits and Robotics, 216-220. ...
- Created on 23 December 2023
- 34. Mathematical substantiation and creation of information tools for optimal control of drilling and blasting in open-pit mine
- (Content №6 2023)
- ... (pp. 585-590). 9. Babets, D., Sdvyzhkova, O., Shashenko, O., Kravchenko, K., & Cabana, E.C. (2019). Implementation of probabilistic approach to rock mass strength estimation while excavating through ...
- Created on 23 December 2023
- 35. Use of backscattering ultrasound parameters for iron ore varieties recognition
- (Content №6 2023)
- ... tracking for motion estimation and flow analysis. Journal of biomedical optics, 23(9), 1-9. https://doi.org/10.1117/1.JBO.23.9.096001. 6. Liu, W.W., & Li, P.C.J. (2020). Photoacoustic imaging of ...
- Created on 23 December 2023
- 36. Theoretical model of random freight flow distribution in the conveyor transport line of the coal mine
- (Content №6 2023)
- ... and estimation of cargo traffic in linehaul conveyor transport of PSP “Shakhta “Pavlogradskaia” PAO DTEK “Pavlogradugol”. Mining electromechanics and automation, (88), 107-111. 28. Kondrakhin, V., Stadnik, ...
- Created on 23 December 2023
- 37. Substantiation of the technological parameters of bucket-wheel excavator forward trench when mining titanium deposits
- (Content №6 2023)
- ... O., Kravchenko, K., & Cabana, E. C. (2019). Implementation of probabilistic approach to rock mass strength estimation while excavating through fault zones. Mining of Mineral Deposits, 13(4), 72-83. ...
- Created on 23 December 2023
- 38. Mineral resource assessment through geostatistical analysis in a phosphate deposit
- (Content №5 2023)
- ... reserves. The aim of this work is to develop a reserve estimation tool using a geostatistical approach. Methodology. The geostatistical approach is based on selecting the most representative variographic ...
- Created on 27 October 2023
- 39. Creation of conceptual solutions for the manufacture of component freight wagons from composites
- (Content №5 2023)
- ... 18. Varbanets, R., Fomin, O., Píštěk, V., Klymenko, V., Minchev, D., Khrulev, A., Zalozh, V., & Kučera, P. (2021). Acoustic Method for Estimation of Marine Low-Speed Engine Turbocharger Parameters. ...
- Created on 27 October 2023
- 40. Liquefaction of industrial zone against earthquake loading using laboratory and field measurements
- (Content №5 2023)
- ... 28(2), 119-137. https://doi.org/10.1007/s10706-009-9285-9. 23. Tsiambaos, G., & Sabatakakis, N. (2010). Empirical estimation of shear wave velocity from in situ tests on soil formations in Greece. ...
- Created on 27 October 2023