Reserves of development rates increase of combine preparatory mine working in the environment of mines of Western Donbass area

User Rating:  / 0
PoorBest 

Authors: L.N. Posunko. 

 
Features of transport-technological schemes of segment combine in-seam working when preparing new extraction pillar in difficult mining and geological conditions of shafts of the Western Donbass have been considered. The reasons of delays in development faces caused by transport and reserves of rising their throughput have been established. The energy saving transport-technological scheme of mine working with application of a cableway and a blind pit have been recommended.
Files:
2010_05 Posun
Date 2012-12-14 Filesize 261.02 KB Download 1118
Tags: Reliability of flowsheetcoefficient of adaptation of equipmentfreight capacity of transport developing sections

Newer news items:

Older news items: