Research of rate of progress of the construction work and relative density of time of entry-driving operations in medium-sized barrels
- Details
- Category: Mine and underground building
- Last Updated on 21 December 2012
- Published on 21 December 2012
- Hits: 2989
Authors: Roienko A.M., Kovalenko V.V., Kharin S.A.
Within the framework of different terms of combination of the productivity of basic entry-driving operations rates and structure of expenses of time of cycle are investigational. The proper analytical dependences are got. Researches are executed in the breeds of different fortress.
Files:
![]() ![]() |
|
![]() ![]() ![]() |
![]() |