Method of creation of digital model of variant calculations of investment project profitability on example of hard coal underground gasification

User Rating:  / 0
PoorBest 

Authors: 

A. Krowiak, Doctor of Technical Science, Central Mining Institute, Kratowice, Poland

Annotation:

The numerical model is supposed to be the means for determination of the functions group enabling the calculation of the Project basic economic indices, on the basis of the optionally chosen combination of the initial data. The functions of the linear and non-linear regression being built based on the chosen series of data have been used for the model generation.

References:

1. Stańczyk K. Czyste technologie użytkowania węgla / Stańczyk K. // Wydawnictwo GIG − Katowice, 2008 P. 176 − 180

2. Larose D.T. Metody i modele eksploracji danych / Larose D.T. // PWN − Warszawa, 2008

3. Dokumentacja programu STATISTICA v.9.0, 2011

4. Stabryła A. Zarządzanie projektami ekonomicznymi i organizacyjnymi / Stabryła A. // Wydawnictwo Naukowe PWN − Warszawa, 2006

Files:
2011_04_krow
Date 2012-11-27 Filesize 455.65 KB Download 1600

Visitors

7564943
Today
This Month
All days
4225
87429
7564943

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (056) 746 32 79.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home Archive by issue 2011 Contents No.4 2011 Solid-state physics, mineral processing Method of creation of digital model of variant calculations of investment project profitability on example of hard coal underground gasification