Study of regularity of geomechanical processes development while developing deposits by the combined way
- Details
- Category: Mining
- Last Updated on 30 September 2016
- Published on 30 September 2016
- Hits: 6988
Authors:
M.B.Nurpeisova, Dr. Sc. (Tech.), Prof., Kazakh National Technical University named after K.I.Satpayev, Republic of Kazakhstan, Almaty, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it., This email address is being protected from spambots. You need JavaScript enabled to view it., This email address is being protected from spambots. You need JavaScript enabled to view it.
O.A.Sarybaiev, Cand. Sc. (Tech.), Assoc. Prof., Kazakh National Technical University named after K.I.Satpayev, Republic of Kazakhstan, Almaty, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it., This email address is being protected from spambots. You need JavaScript enabled to view it., This email address is being protected from spambots. You need JavaScript enabled to view it.
O.S.Kurmanbaiev, PhD, Kazakh National Technical University named after K.I.Satpayev, Republic of Kazakhstan, Almaty, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it., This email address is being protected from spambots. You need JavaScript enabled to view it., This email address is being protected from spambots. You need JavaScript enabled to view it.
Abstract:
Purpose. The introduction of modern geodetic array condition monitoring methods in order to establish laws governing the development of geomechanical processes in the combined method of developing Maykain gold deposit, ensuring high accuracy and performance of surveying.
Methodolody. Analysis and synthesis of theoretical research in the process of displacement of different geological conditions of deposits, systematization of international experience in usage of combined development of gold deposits, experimental studies in the laboratory and mine conditions, analytical calculations, processing observation results by methods of mathematical statistics and computer modeling.
Findings. For safe and efficient extraction of gold, effects of natural and geotechnical factors on the development of deformation processes were studied, this allowed evaluating the possibility of regulating their influence on rock mass and engineering structures.
Geomechanical monitoring of the condition of the rock mass was conducted using modern surveying instruments, which provided high accuracy and performance of surveying.
The determined conditions of cracking in the rear sight between the open and underground workings allow obtaining information on changes of geomechanical condition of overlying layers of rock mass.
A scheme of rock mass movement during the application of the combined method of mining of Maykain deposit was established which allows choosing different ways of managing geomechanical processes.
Originality. Consists in developing a method of monitoring an array status on the basis of modern geodetic instruments, with a high information content and accuracy of the determination in the process of shifting patterns.
Practical value consists in the introduction high-precision geodetic methods into the production, namely, into system of geomechanical monitoring while combining open pit and underground works.
References/Список літератури
1. Rockburst and seismicity in mines proceedings.-Australia: Australian Centre for Geomechanics, 2005.
2. Viktorov, S.D., Iofis, M.A. and Odintsev, V.N., 2005. Destruction of rocks and the risk of man-made disasters. Mining Journal, No. 4, pp. 30–35.
Викторов С.Д. Разрушение горных пород и риск техногенных катастроф / С.Д.Викторов, М.А.Иофис, В.Н.Одинцев // Горный журнал. – 2005. – №4. – С. 30–35.
3. Owen, M.L., 2005. Calibrating a semi-quantitative seismic risk model using rockburst case studies from underground metalliferous mines. In: Australian Centre for Geomechanics, Controlling seismic risk, Sixth International Symposium on Rockburst and Seismicity in Mines Proceedings. Australia, 9–11 March 2005. Australian Centre for Geomechanics
4. Chernyi, A.D. and Terentiyev, V.I., 1998. Complex open-underground mining of side and under quarry reserves of ore deposits. Moscow: IPKONANSSSOR.
5. Kaplunov, D.R. and Chaplygin, I.I., 2003. Principles of projecting combined technologies during mining of large deposits of solid minerals. Mining journal, No. 12, pp. 18–23.
6. Sashurin, A.D. and Panzhin, A.A., 2005. Diagnosis of geomechanical condition of rock massif geodetic methods. In: Problems of geotechnology and geology, pp. 170–178.
Сашурин А.Д. Диагностика геомеханического состояния массива горных пород геодезическими методами / А.Д.Сашурин, А.А.Панжин // Проблемы геотехнологии и недроведения. – Екатеринбург: ИГД УрО РА, 2005. – С.170–178.
7. Iofis, M.A., Miletenko, N.A. and Odintsev, V.N., 2011. Geomechanical approach to forecast dangerous hydrological processes in the development of solid minerals. Mining Informational and Analytical Bulletin (scientific and technical journal) GIAB, No. 7, pp. 103–108.
Иофис М.А. Геомеханический подход к прогнозу опасных гидрогеологических процессов при разработке твердых полезных ископаемых / М.А.Иофис, Н.А.Милетенко, В.Н.Одинцев // ГИАБ. – 2011. – № 7. – С. 103–108.
8. Miletenko, N.A. and Nurpeisova, M.B., 2014. Hazardous Weather geomechanical processes at the combined method of field development. Mine Surveying Bulletin, No. 4, pp. 55–58.
Милетенко Н.А. Прогноз опасных геомеханических процессов при комбинированном способе раработки месторождений / Н.А.Милетенко, М.Б.Нурпеисова // Маркшейдерский вестник. – 2014. – № 4. – С. 55–58.
9. Nurpeisova, M.B.,Kyrgizbaeva, G.M. and Sarybayev, O.A., 2015. Monitoring of the earth’s surface displacements during the subsoil development, Balkema, pp. 161–169.
04_2016_Nurpeisova | |
2016-09-26 874.69 KB 961 |