- 41. Substantiation of rational drive parameters for reliable operation of heavy-loaded mechanisms
- (Geotechnical and mining mechanical engineering, machine building)
- ... in Mining: School of Underground Mining, 2011, 211-214. Retrieved from https://www.researchgate.net/publication/330310760_The_stress strain_state_of_the_stepped_rubber rope_cable_in_bobbin_of_winding ...
- Created on 26 October 2019
- 42. Technological, lithological and economic aspects of data geometrization in coal mining
- (Mining)
- ... of underground mining and provide an opportunity to extract the coal reserves at an economically suitable level. The proposed technological solutions were checked in practical conditions for the development ...
- Created on 26 October 2019
- 43. Studying coal seam bedding tectonic breach impact on supporting parameters of mine workings with roof bolting
- (Mining)
- ... space. Interexpo Geo-Siberia, (4), 184-188. 15. Zubov, V. P. (2018). Modern technology and relevant problems of resource with underground mining of bedded deposits of minerals. Mining journal, (6), ...
- Created on 26 October 2019
- 44. On applying high-class mechanisms of heavy-loaded machines
- (Geotechnical and mining mechanical engineering, machine building)
- ... and Geoinformational Systems in Mining: School of Underground Mining 2011, 211-214. повний текст / full article ...
- Created on 16 June 2019
- 45. Geo-energetics of Ukrainian crystalline shield
- (Mining)
- ... geodynamic conditions by underground mining of ore fields of Ukraine is executed. The ways of development of new hypotheses, theories and methods of research of the energy condition of rocks are given. ...
- Created on 13 June 2019
- 46. Stability analysis of the pillars of the underground mine Chaabet El-Hamra, Algeria by analytical and numerical methods
- (Mining)
- ... of the proposed technique through the PLAXIS 3D software. Findings. Using more than one method in underground mining for analysis of the existing or proposed technique is the best solutions for achieving ...
- Created on 24 April 2019
- 47. Methods for monitoring the earth surface displacement at points of small geodetic network under the underground method of coal development
- (Mining)
- ... A. G. and Kovalev, K. V., 2013. Estimation of displacements and deformations of the earth surface during underground mining of coal deposits using the method of radar interferometry. Transactions ...
- Created on 24 April 2019
- 48. To the problem of selecting vertical shafts location with combined geotechnology of developing deposits
- (Mining)
- ... using the combined geotechnology in the course of further development of fields that assume open-underground mining. References. 1. Volkov, Yu.V. and Sokolov, I.V., 2013. Underground geotechnology ...
- Created on 24 April 2019
- 49. Determination of drilling and blasting parameters considering the stress-strain state of rock ores
- (Mining)
- ... change-over to TNT-free explosives for the purposes of ore underground mining in Kryvyi Rih basin. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, 4, pp. 79–84. 3. Stupnik, N. and ...
- Created on 08 March 2019
- 50. Method for determining high-speed vehicle contact forces of the ground transport
- (Geotechnical and mining mechanical engineering, machine building)
- ... Y., Samusia, V., Kyrychenko, V. and Goman, O., 2012. Experimental investigation of aeroelastic and hydroelastic instability parameters of a marine pipeline. Geomechanical Processes During Underground Mining, ...
- Created on 03 March 2019