- 1. Mathematical substantiation and creation of information tools for optimal control of drilling and blasting in open-pit mine
- (Content №6 2023)
- ... the informational infrastructure necessary for effectively managing drilling and blasting operations in open-pit mining of rock deposits. To define the distribution function of natural rock blocks within ...
- Created on 23 December 2023
- 2. Simulation of the geomechanical processes in the block of the rock massif containing steep ore deposit excavation
- (Mining)
- Authors: K.S. Ishchenko, Cand. Sci. (Tech.), Senior Research Fellow, N.S. Polyakov Institute of Geotechnical Mechanics of National Academy of Science of Ukraine, Senior Research Fellow, Dnipropetrovsk, ...
- Created on 24 December 2013
- 3. Development and adoption of new technical decisions for development of Yuzhno-Belozerskoye ore deposit under difficult mining and geological conditions
- (Mining)
- ... The research resulta have been tested in the mine “Ekspluatatsionnaya” of ZAO “Zaporozhskiy zhelezorudny kombinat” at the depth of 740–825 m. Rock block holing of the ore massif in cameras was done by ...
- Created on 08 November 2012