- 21. Kinetics of quartz sand and its mixtures drying by microwave radiation
- (Content №1 2021)
- ... as in technologies and equipment for drying and structuring fine-grained dielectric materials and their mixtures development, creating new capillary-porous media, etc. under microwave radiation influence. ...
- Created on 05 March 2021
- 22. Sodium silicate solute foaming in a flat slot-type capillary under microwave radiation influence
- (Content №6 2020)
- ... A mass transferring mechanism during liquid glass foaming in flat slot-type capillary under microwave radiation influence has been determined. Methodology. Sodium soda silicate solute with silicate module ...
- Created on 22 December 2020
- 23. Experimental research on hydraulic resistance of deformed woven meshes
- (Contens №5 2020)
- ... provide continuity of fuel based on capillary strength. Visnyk Dnipropetrovskoho Universytetu. Seriia istoriia i filosofiia nauky i tekhniky (20), 160-164. 7. Hartwig, J. W. (2015). Liquid acquisition ...
- Created on 30 October 2020
- 24. Peculiarities of mining the protecting pillar in the laminal massif of soft rocks
- (Contens №5 2020)
- ... the completeness of mining coal reserves from protecting pillars located in a laminal massif of soft rocks in the roof and bottom in order to reduce the coal losses in mines and horizons in case when mining ...
- Created on 30 October 2020
- 25. Technical and economic substantiation of developing Kusmuryn copper deposit (Kazakhstan)
- (Contens №6 2019)
- ... and ores. Findings. To improve economic performance and to reduce the cost of concentrate at the Kusmuryn deposit, the mining system is being changed. To replace the chamber-and-pillar development ...
- Created on 23 December 2019
- 26. Substantiating parameters of zeolite-smectite puff-stone washout and migration within an extraction chamber
- (Contens №6 2019)
- ... Universytetu, (4), 44-54. 17. Stupnik, M., Kalinichenko, V., & Pismennyi, S. (2013). Pillars sizing at magnetite quartzites room-work. Annual Scientific-Technical Colletion – Mining of Mineral ...
- Created on 23 December 2019
- 27. Determination of static equilibrium conditions of a mobile terrestrial robotic complex
- (Geotechnical and mining mechanical engineering, machine building)
- ... vehicle caterpillar mover dynamic processes under condition of the distributing the parameters of the caterpillar. International Journal of Engineering & Techology, 7(4/3), 40-46. 20. Strutynsky, ...
- Created on 26 October 2019
- 28. Developing technological schemes of driving workings with controlled resistance of contours
- (Mining)
- ... Zh. Kazakh., 7, 5-9. 2. Galvin, J. M. (2016). Pillar Extraction. InGround Engineering – Principles and Practices for Underground Coal Mining (pp. 309-358). Cham: Springer International Publishing. ...
- Created on 13 June 2019
- 29. Contens 02 2019
- (Contens №2 2019)
- ... M.Fredj. Stability analysis of the pillars of the underground mine Chaabet El-Hamra, Algeria by analytical and numerical methods 21 Solid ...
- Created on 07 May 2019
- 30. Stability analysis of the pillars of the underground mine Chaabet El-Hamra, Algeria by analytical and numerical methods
- (Mining)
- ... University Abderrahmane Mira, Bejaia, Algeria, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. Abstract: Purpose. Analysis of the current and proposed room and pillar exploitation technique of the Zinc mine ...
- Created on 24 April 2019
- 31. Methods for monitoring the earth surface displacement at points of small geodetic network under the underground method of coal development
- (Mining)
- ... of the width of the safety pillars of capital mine workings. Mining information and analytical bulletin (scientific and technical journal). - Moscow, Mining Book, pp. 193‒208. Available at: <https://cyberleninka.ru/article/n/obosnovanie-shiriny-predohranitelnyh-tselikov-kapitalnyh-gornyh-vyrabotok> ...
- Created on 24 April 2019
- 32. To the problem of selecting vertical shafts location with combined geotechnology of developing deposits
- (Mining)
- ... D., 2018. Development of a spring analogue approach for the study of pillars and shafts. International journal of Mining Science and Technology, 28(2), pp. 267‒274. 7. Hudej, M., Vujic, S., Radosavlevic, ...
- Created on 24 April 2019
- 33. Determination of drilling and blasting parameters considering the stress-strain state of rock ores
- (Mining)
- ... 8. Stupnik, N., Kalinichenko, V. and Pismennyi, S., 2013. Pillars sizing at magnetite quartzites room-work. In: Annual Scientific-Technical Colletion – Mining of Mineral Deposits, pp. 11–15. ...
- Created on 08 March 2019
- 34. Identification of material parameters for numerical simulation of the behavior of rocks under true triaxial conditions
- (Solid State Physics, Mineral Processing)
- ... and Mining Sciences, 42(2), pp. 219–235. DOI: 10.1016/j.ijrmms.2004.08.007. 2. Cheng, Y. M., Wang, J. A., Xie, G. X. and Wei, W. B., 2010. Three-Dimentional Analysis of Coal Barrier Pillars in ...
- Created on 29 October 2018
- 35. Substantiatio nof the ways to use lignite concerning the integrated development of lignite deposits of Ukraine
- (Mining)
- ... 2017. Evaluating performance of lignite pillars with 2D approximation techniques and 3D numerical analyses. International Journal of Mining Science and Technology, 27(6), pp. 929‒936. DOI: 10.1016/j.ijmst.2017.06.014. ...
- Created on 03 July 2018
- 36. Modeling of stress-strain state of fractured rock mass nearby of conjugated workings
- (Mining)
- ... 2014. Optimization of room-and-pillar metod parameters under conditions of limestone rocks. Progressive Technologies of Coal, Coalbed Methane, and Ores Mining. ISBN: 978-1-138-02699-5, pp. 511‒516. 6. Stupnik, ...
- Created on 11 March 2018
- 37. Distribution of displacements around a single mine working driven in stratified rock mass
- (Mining)
- ... or by a network of underground cavities. Features of geomechanical processes taking place in the neighborhood of a mine working were analyzed with the help of complicated technical “mine working-pillar-rock ...
- Created on 11 January 2018
- 38. Water balance control within rock mass using the capacity of water-bearing formations
- (Mining)
- ... [e-journal] 19(1), pp. 82‒86. http://doi.org/10.18599/grs.19.1.13. 5. Sadovenko, I.А., Demchenko, Yu.I. and Ulitskii, О.А., 2003. Evaluation of Geomechanical Stability of Inter-Shaft Pillars. ...
- Created on 06 September 2017
- 39. Failure mechanism analysis on hanging arch roof caving at end of underground coal working face
- (Mining)
- ... curved triangle area and expression of supporting pressure borne by protective coal pillars surrounding the curved triangle area. To reflect the results, mathematical derivations are done. Findings. ...
- Created on 21 May 2017
- 40. Principles of rock pressure energy usage during underground mining of deposits
- (Mining)
- ... 2014. On dimensioning support pillars of rock fractures using the results of geodesic control. Suchasnі resursozberіhaiuchі tekhnolohіi hіrnychoho vyrobnytstva, 1(13), рр. 82‒88. 5. Bondarenko, V., ...
- Created on 21 May 2017