- 41. Information technologies in modeling operation modes of mining dewatering plant based on economic and mathematical analysis
- (Contens №4 2020)
- ... the value of the economically advantageous diameter does not depend on the number of reserve pipelines used. Originality. The research presents the theoretical substantiation of the feasibility of ...
- Created on 30 August 2020
- 42. Approbation of the technology of efficient application of excavator-automobile com-plexes in the deep open mines
- (Contens №4 2020)
- ... / full article Abstract: Purpose. To establish the feasibility of implementing the technology for working out the overburden rock ledges and ore mining by transverse panels in steeply ...
- Created on 30 August 2020
- 43. Illegal mining of mineral resources of the national importance: issues of subsoil protection with criminal-legal remedies
- (Contens №2 2020)
- ... Originality. The authors article have proved the necessity of considering illegal mining of mineral resources to be a completed offence from the moment of committing an act aimed at their extraction by any means. A circle of subjects and tasks of collaboration during investigation of illegal mining is defined. Feasibility of using copters when inspecting a crime scene is substantiated. ...
- Created on 10 May 2020
- 44. Technological solutions development for mining adjacent rock mass and pit reserves taking into account geomechanical assessment of the deposit
- (Contens №2 2020)
- ... Originality. It consists in feasibility evaluation of using a rational technology for the development of mining operations according to the option that provides for the minimum overburden ratio and possible mining development schemes for mining open pit reserves with an assessment of the possibility of internal dumping during the development of an open pit. ...
- Created on 10 May 2020
- 45. Development of a fiber filter for dust chambers
- (Content №1 2020)
- ... Findings. Research studies on various types and designs of dust chambers have shown the feasibility of developing a new design of the dust chamber equipped with a modular fiber filter to increase ...
- Created on 10 March 2020
- 46. The development of technological solutions on mining and processing brown coal to improve its quality
- (Contens №6 2019)
- ... coal deposits; geological and engineering and hydro-technical analysis; system and feasibility studies on mining operation indicators and parameters of coal processing; laboratory tests, field experiment. ...
- Created on 23 December 2019
- 47. Conceptual approach to financial support of regional territory infrastructure development
- (Economy and Management)
- ... for credit financing, has been identified. Feasibility of the accelerated schedule of credit resources disbursement has been proved for the conditions of putting the object into the starting operational ...
- Created on 26 October 2019
- 48. Business environment of the country: approaches to evaluation in the context of management processes
- (Economy and Management)
- ... spheres of adequate practical use of rating-factor and actual-result indicators is proposed. The conclusion on the feasibility of using indicators related to foreign direct investment as the key indicators ...
- Created on 19 August 2019
- 49. Optimization of times of start-braking regimes of frequency-regulated asynchronous engine with pumping load
- (Electrical Complexes and Systems)
- ... of its acceleration and deceleration time for minimizing the loss concerned, as well as checking the feasibility of their optimal values of time in hydraulic systems. Methodology. The methods of mathematical ...
- Created on 03 March 2019
- 50. Features of the legal protection of property rights in Ukraine and the European Union
- (Economy and Management)
- ... of property rights protection in the European Union member States, to prove that the basis for the legal protection of property rights should be economic feasibility rather than the political situation ...
- Created on 26 December 2018