- 1. The combined method for assessing risk factors in underground construction
- (Contens №3 2020)
- ... and quantitative assessment of risk factors accompanying the construction and operation of underground constructions based on expert analysis and mathematical modeling by numerical methods. Methodology. ...
- Created on 02 July 2020
- 2. Method of selection of ERP systems using multi-criterial optimization models
- (Economy and management)
- Authors: M.A.Demydenko, Cand. Sc. (Tech.), Assoc. Prof., orcid.org/0000-0001-6298-2079, National Mining University, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. Abstract: Purpose. To ...
- Created on 29 October 2018
- 3. Assessment of coal mine waste dumps development priority
- (Mining)
- ... aerospace image program. Findings. With the help of the expert analysis method, the worth coefficients of each of the nine proposed waste dumps indicators have been established, which enable ...
- Created on 27 August 2018
- 4. Mathematical modeling of the operating process of the engine and means of increasing service life of vehicles
- (Geotechnical and mining mechanical engineering, machine building)
- ... The Research Of Service Life Of Major Unit Assemblies Of Road Train And The Expertise Of Expert Analysis Of Causes Of Changes Of Their Technical State. The National Transport University Bulletin: A Scientific ...
- Created on 03 July 2018
- 5. The substantiation of construction, peculiarities of assembling and calculating multi-level system of heating of reservior products conducted on the basis of “dth” deep pipe heaters
- (Geotechnical and mining mechanical engineering, machine building)
- ... (ARP) using expert analysis and assess of the results obtained. Findings. The research resulted in substantiation of the construction of heater of “DTH” pipe deep type, and elaboration of a multi-level ...
- Created on 04 August 2016