- 1. Substantiating rational schedule to load trucks using draglines while mining a pit of Motronivskyi MPP
- (Content №4 2021)
- ... the efficiency of dragline excavators operating in combination with heavy-duty dump trucks. Naukovyi Visnyk Natsionalnoho Hirnychoho Univesytetu, (5), 31-36. 10. Sobko, B.Yu., & Lozhnikov, O.V. (2019). ...
- Created on 23 August 2021
- 2. Determining conditions of using draglines in single-tier internal dump formation
- (Content №6 2020)
- ... Abstract: Purpose. The scientific and practical task of the study is to establish the dependences of the safe distance of dragline excavators on the height of a single-tier internal ...
- Created on 22 December 2020
- 3. Determination of productivity of dragline excavators working together with heavy dump truck
- (Mining)
- ... Hirnychozbahachuvalnyi Kombinat », mine foreman, Komsomolsk, Poltava oblast, Ukraine Annotation: In the article the results of studies on the productivity of dragline excavators applied for ...
- Created on 21 November 2012