An improvement of technology of working of deposits bottom layer by development system with ore and enclos-ing strata toppling
Authors: V.O. Kalinichenko, O.L. Shepel
As a result of the research it is offered a technology of reduction of ore losses on the bottom layer of the deposit by means of displacement of broken ore from the dead area of the bottom layer of the deposit in the zone of active release. The principle of displacement of broken ore which is provided by sharper dynamic push of the concentrated charge is considered. The charge location in mine pockets of boring niches in the bottom layer is specified. It is underlined, that undercutting reserves of ore of the dead area of the bottom layer towards release allows reducing losses of ore mass on the bottom layer of the deposit.
Files:
2010_09-10 Kalin | |
2012-12-14 293.12 KB 1287 |
Tags: technology of working • lying wall • deposit • mining method • ore losses • displacement of broken ore • dead area • concentrated charge • explosive • chisel niches
Newer news items:
- Natural researches of behaviour of the rock mass around primary extraction cameras - 04/01/2013 12:39
- The surveying control of the condition of mine workings under transition by coal-face works - 04/01/2013 12:38
- Study of efficiency of recovered fiber concrete at various reinforcement fibers - 04/01/2013 12:37
- Dependence of pull of ideal filament along the line of contact with immobile block when sliding - 04/01/2013 12:35
- About stability of the levels of the deep anthracitic mines in the zones near-by disjunctives - 04/01/2013 12:33
- A geocontrol system in a complex technology of tamponage workings passed in watered tectonic broken rock regions - 04/01/2013 12:32
- About estimation of prognosis degree of outburst hazard of coal seams as the depth of mine works increases - 04/01/2013 12:30