Towards estimation of workings efficiency near the watered tectonic violations
Authors: A.Ye. Kipko
The article describes the results of analytical treatment of efficiency of technological process of drive working in conditions of watered tectonic broken rocks. It has been adduced that combined service is the most acceptable variant of technical service for preparatory working. Analytical expression for estimation of preparatory works efficiency has been got.
Files:
2010_06 Kip | |
2012-12-14 176.52 KB 1004 |
Tags: efficiency • optimization • drilling works • emergency situation • technical service • reliability
Related news items:
Newer news items:
- Modeling of deformation of area around primary mining cameras by means of equivalent materials - 26/12/2012 15:29
- Features of computing design of interaction of anchor and rock of mountain massif - 26/12/2012 15:28
- Hydromechanical changes of the reservoir water-bearing gas storage coefficients - 26/12/2012 15:27
- Ways of impulse washing of wells - 26/12/2012 15:25
- Substantiation of parameters of mine workings maintenance for reuse - 26/12/2012 15:21
- Adaptive optimization of processing cycle and parameters of working face breaking mode by means of heading machine of selective action by resource criterion - 26/12/2012 15:19
- Staged transformation of rock flows when diversificating mining product - 26/12/2012 15:16
- Reducing of ore dilution by layer-by-layer breaking and draving - 26/12/2012 15:14