Reserves of development rates increase of combine preparatory mine working in the environment of mines of Western Donbass area
Authors: L.N. Posunko.
Features of transport-technological schemes of segment combine in-seam working when preparing new extraction pillar in difficult mining and geological conditions of shafts of the Western Donbass have been considered. The reasons of delays in development faces caused by transport and reserves of rising their throughput have been established. The energy saving transport-technological scheme of mine working with application of a cableway and a blind pit have been recommended.
Files:
2010_05 Posun | |
2012-12-14 261.02 KB 1242 |
Tags: Reliability of flowsheet • coefficient of adaptation of equipment • freight capacity of transport developing sections
Newer news items:
- Influence of technogenic factor on physical properties of sandstone - 25/12/2012 15:47
- Predictive estimate of intrusive rock deposits perspective for the blok stone production - 25/12/2012 15:46
- Properties of soil created by means of layerwise mine-technical and biological recultivation - 25/12/2012 15:45
- Assessment of influence of blasting factors on pace of shaft - 25/12/2012 15:38
- Technological parameters and circuits of development at final stage of opening of deposits of rocky building materials - 25/12/2012 15:37