About the feasibility of optimization of longwall length during development of deeply buried thin antracitic strata

User Rating:  / 1
PoorBest 

Authors: 

Ye.A. Kremneva, Antratsit Faculty of Mining and Transport, V. Dal East Ukrainian National University, Magister, Secretary of Dean, Antratsit, Ukraine

Annotation:

State of the Ukrainian coal industry and the work of coal mining enterprises developing thin anthracite stratums were analyzed. Mining and geological conditions of mining at a depth of 1000 metres or more were considered. The actual load on the working face was analyzed. The necessity of limiting the length of working face because of the specific behavior of rock pressure is substantiated.

References:

1. Клишин Н.К. Управление состоянием массива горных пород: Конспект лекций / Клишин Н.К. – Алчевск: ДонГТУ, 2005. – 214 с.

Klishin N.K. Rock massif state control: lecture summary / Klishin N.K. – Alchevsk: DonDTU, 2005. – 214 p.

2. Технология подземной разработки пластовых месторождений полезных ископаемых: учебник для вузов / [Бондаренко В.И., Кузьменко А.М., Грядущий Ю.Б., и др.]. – Днепропетровск, 2002. – 730 с.

Technology of underground development of stratal deposits of minerals: higher school textbook / [Bondarenko V.I., Kuzmenko A.M., Gryadushchiy Yu.B. et al.]. – Dnepropetrovsk, 2002. – 730 p.

Files:
2011_04_krem
Date 2012-11-27 Filesize 598.9 KB Download 1456

Visitors

7350836
Today
This Month
All days
111
40339
7350836

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (056) 746 32 79.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home Archive by issue 2011 Contents No.4 2011 Mining About the feasibility of optimization of longwall length during development of deeply buried thin antracitic strata