Minimization of power fluctuations of wind power plants when constructed in exclusion zones of enterprises
- Details
- Category: Content №1 2023
- Last Updated on 25 February 2023
- Published on 30 November -0001
- Hits: 3201
Authors:
Yu.G.Kachan, orcid.org/0000-0001-9984-3646, Zaporizhzhia Polytechnic National University, Zaporizhzhia, Ukraine
V.V.Kuznetsov, orcid.org/0000-0002-8169-4598, Ukrainian State University of Science and Technologies, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
O.A.Shram*, orcid.org/0000-0003-4206-7716, Zaporizhzhia Polytechnic National University, Zaporizhzhia, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
* Corresponding author e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu. 2023, (1): 115 - 121
https://doi.org/10.33271/nvngu/2023-1/115
Abstract:
Purpose. Development of a methodology for selecting types and quantities of wind turbines built in exclusion zones of industrial enterprises to minimize fluctuations in the power generated by them and increase the efficiency of their use.
Methodology. The work used methods of synthesis of systems, computer modeling in the calculation of the optimal number of different types of wind turbines, methods of combinatorics.
Findings. The developed method for designing wind power plants built in the exclusion zones of enterprises allows determining the required number of different types of wind turbines with different capacities and nominal values relative to the wind speed, which will provide the necessary generated power with minimal fluctuations. This makes it possible to notably reduce the capacity required for the accumulation of excess generation and to significantly reduce the cost of implementing wind turbines.
Originality. The work proposes a methodology for designing wind power plants based on various wind turbines, taking into account their type, power and wind characteristics of the area where the wind power plant is being built. It has been found that the coefficient of fluctuation of the power generated by the wind power plant built on the same type of wind turbines does not depend on the capacity of such a station, nor on the number of wind turbines used, but only on the type of the latter and the wind characteristics of the area where it was built.
Practical value. Wind power plants used at enterprises have significant daily and annual fluctuations in the power generated by them. The proposed approach allows reducing fluctuations of power generated by the station, as well as increasing the amount of electricity generation in comparison with the use of the same type of wind turbines.
Keywords: wind power plant, power fluctuations, wind characteristics, combinatorial problem, generation, computer modeling
References.
1. Boiko, S. M. (2020). Theoretical principles of formation of electric power systems with sources of mining enterprises’ dispersed generation: monograph. Ed. Doctor Technical Sciences, Professor O. N. Sinchuk. Kremenchuk: Shcherbatykh O. V. ISBN 978-617-639-259-0.
2. Synchuk, Y. O., Huzov, E. S., Yalovaia, A. N., & Boiko, S. N. (2015). Potential of electric energy efficiency and the path of its realization on productions with underground methods of getting iron cheese. monograph. Ed. Doctor Technical Sciences, Professor O. N. Sinchuk. Kremenchuk: Shcherbatykh O. V.
3. Kachan, Yu. G., & Kuznetsov, V. V. (2019). On the practical application of renewable energy sources in non-traction consumer power systems. Mining Electromechanics and Automational. Scientific and Technical Collection, 102, 21-25.
4. Kachan, Yu. G., & Kuznetsov, V. V. (2019). Features of operation of wind power stations as a supplementary source of electricity for non-traction consumers of railway electric mains. Theory and practice of metallurgy, 3, 36-41.
5. Kosarev, A. B., Rebrov, I. A., Naumenko, S. N., & Barch, A. V. (2020). Scientific priorities for the use of alternative energy sources in railway transport. VNIIZHT Scientific Journal, 79(5), 293-300. https://doi.org/10.21780/2223-9731-2020-79-5-293-300.
6. Sinchyk, O. M., & Boiko, S. M. (2014). The peculiarities of the wind power generating autonomous system exploitation in the underground mountain iron-ore mining. Technology Audit and Production Reserves, 1(1(15), 17-20. https://doi.org/10.15587/2312-8372.2014.21213.
7. Senko, V. I., Boiko, S. M., Shcherbak, M. A., & Zhukov, A. O. (2013). Mathematical model of the control system of the wind power plant’s electrical complex based on fuzzy controller. Electrical and Energy Saving Systems. Thematic Issue “Problems of Automated Electric Drive. Theory and Practice”, Kremenchuk, KrNU, 117-129.
8. Pan, H., Li, H., Zhang, T., Laghari, A. A., Zhang, Z., Yuan, Y., & Qian, B. (2019). A portable renewable wind energy harvesting system integrated S-rotor and H-rotor for self-powered applications in high-speed railway tunnels. Energy Conversion and Management, 196, 56-68. https://doi.org/10.1016/j.enconman.2019.05.115.
9. Kumar, A., Karandikar, P., & Chavan, D. S. (2015). Generating and saving energy by installing wind turbines along the railway tracks. 2015 International Conference on Energy Systems and Applications. https://doi.org/10.1109/icesa.2015.7503307.
10. Garshasbi, H., & Mahmoudi, A. (2019). A Novel Method for Power Generation Using Trains. 2019 Iranian Conference on Renewable Energy & Distributed Generation (ICREDG). https://doi.org/10.1109/icredg47187.2019.9218487.
11. Sychenko, V. H., & Pulin, M. M. (2017). Energy efficient DC traction power supply system with distributed generation. Ukrainian Railways, 5-6(47-48), 28-32.
12. Wind turbines database. Retrieved from https://ecoelectro.com.ua/wind-turbine-eurowind-5.html.
13. Wind generator vertical Atmosfera VAWT-5L-3000 windmill, wind power plant. Retrieved from https://avtonom.com.ua/alternativnaya-energetika/vetrogeneratory/vetrogenerator-vertikalnyy-atmosfera-vawt-5l-3000/.
Newer news items:
- Factor analysis of assessment of the economic potential of mining companies - 25/02/2023 01:06
- Forecasting the innovation of Ukraine’s economic development in a global dimension - 25/02/2023 01:06
- The competitive strategy profile of Ukrainian inland water transport: economic justification - 25/02/2023 01:06
- Tools for assessing obstacles in implementation of energy saving measures by enterprises - 25/02/2023 01:06
- Digital technologies as a reason and tool for dynamic transformation of territory marketing - 25/02/2023 01:06
- Data collection system with signal optimal-routine for the mining and environmental monitoring in Vietnam - 25/02/2023 01:06
- Analysis of numeric results for analogue of Galin’s problem in curvilinear coordinates - 25/02/2023 01:06
- Research on the impact of cognitive biases of workers on the subjective assessment of occupational risk - 25/02/2023 01:06
- Criminological characterization of environmental crimes in the field of subsurface resources protection - 25/02/2023 01:06
- Reducing external air leakage at the main ventilation unit of the mine - 25/02/2023 01:06
Older news items:
- Mathematical model of the closed-loop system of excavator bucket positioning - 25/02/2023 01:06
- Increasing the energy efficiency of modes of distribution networks with photovoltaic stations - 25/02/2023 01:06
- Load of a semi-car having the dismountable roof of composites - 25/02/2023 01:06
- Analysis of surface settlements induced by tunnel excavation with EPB-TBM - 25/02/2023 01:06
- Features of modernization of a truck with a hybrid power transmission - 25/02/2023 01:05
- Geometry variation of ballasted railway tracks due to weather conditions - 25/02/2023 01:05
- Graphitizing modification of the axial zone of cast iron rolling rolls in the liquidus-solidus temperature range - 25/02/2023 01:05
- Reverse flotation process in double stage on the Algerian phosphate ore treatment - 25/02/2023 01:05
- Modeling of drilling water supply wells with airlift reverse flush agent circulation - 25/02/2023 01:05
- Geomechanical substantiation of parameters for safe completion of mining the coal reserves adjacent to main workings - 25/02/2023 01:05