Modelling impact of hybrid methodology on performance of IT-enterprises

User Rating:  / 0
PoorBest 

Authors:


M. Bosovska, orcid.org/0000-0002-6021-5228, State University of Trade and Economics, Kyiv, Ukraine, e-mail This email address is being protected from spambots. You need JavaScript enabled to view it.

A. Piliukov*, orcid.org/0009-0008-0802-4361, State University of Trade and Economics, Kyiv, Ukraine, e-mail This email address is being protected from spambots. You need JavaScript enabled to view it.

* Corresponding author e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.


повний текст / full article



Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu. 2026, (4): 200 - 210

https://doi.org/10.33271/nvngu/2026-4/200



Abstract:



Purpose.
To develop and empirically verify a model-based approach to assessing the impact of a hybrid project management methodology on the performance of software development enterprises, taking into account the level of managerial maturity and the moderating role of artificial intelligence tools.


Methodology.
The study is based on an original survey of 93 Ukrainian IT enterprises (2026) and combines cluster analysis (the k‑means algorithm with the silhouette quality criterion), multiple regression modelling (OLS), the Analytic Hierarchy Process (AHP) with verification of the consistency of expert judgements (CR < 0.1), and three-level scenario modelling. The enterprise typology is constructed by level of managerial maturity through the aggregation of managerial, engineering and business indicators.


Findings.
A typology comprising three enterprise types is empirically confirmed: start-up, established Agile practices, and mature enterprise level. The regression model (R2 = 0.957) revealed a statistically significant effect of the presence of a project management office, CI/CD maturity and AI readiness on the composite project performance index (PPI). The transformation of the management system is substantiated through three scenarios: baseline, formalisation of the hybrid methodology, and integration of artificial intelligence tools. An adaptive PPI structure with differentiated subindex weights and assessment time horizons is proposed; the projected performance gain falls within the range of 10–40 %, peaking at highly mature enterprises.


Originality.
A multi-level model for assessing the impact of a hybrid project management methodology has been developed and empirically verified which, unlike descriptive maturity models, combines an enterprise typology based on managerial maturity, an adaptive composite PPI indicator and a four-stage scheme for transforming management practices. The model operationalises the non-linearity of the transition between maturity levels while accounting for the moderating role of AI tools and the resource constraints of the enterprise.


Practical value.
The proposed model is intended to serve as an analytical instrument for substantiating managerial decisions concerning the adoption of a hybrid methodology and the integration of artificial intelligence at software development enterprises. Its application delivers a predictably positive economic effect through the reduction of losses, revenue growth and an increase in the intangible value of assets, and provides a quantitative rationale for investment decisions by demonstrating positive NPV and IRR.



Keywords:
hybrid methodology, project management, composite PPI indicator, artificial intelligence, IT enterprises

References.


1. Reiff, J., & Schlegel, D. (2022). Hybrid project management – a systematic literature review. International Journal of Information Systems and Project Management, 10(2), 45-63. https://doi.org/10.12821/ijispm100203

2. Khan, U., & Qaiser, M. (2025). Hybrid project management and its effects on project performance. International Journal of Organization Theory & Behavior, 1-18. https://doi.org/10.1108/IJOTB-09-2024-0166

3. Bianca, B., & Hanslo, R. (2025). The evolution of Agile and Hybrid project management methodologies: A systematic literature review. arXiv:2511.02859. https://doi.org/10.48550/arXiv.2511.02859

4. Fabbro, E., & Tonchia, S. (2021). Project management maturity models: Literature review and new developments. The Journal of Modern Project Management, 8(3), 34-45. https://doi.org/10.19255/JMPM02503

5. Mahdi, E. (2025). Project management maturity in project-based organizations: Frameworks, drivers, and the role of sustainability. Future Business Journal, 11, 245. https://doi.org/10.1186/s43093-025-00670-z

6. Almeida, P. M., Fernandes, G., & Santos, J. M. R. C. A. (2025). Artificial intelligence tools for project management: A knowledge-based perspective. Project Leadership and Society, 6, 100196. https://doi.org/10.1016/j.plas.2025.100196

7. Salimimoghadam, S., Ghanbaripour, A. N., & Tumpa, R. J. (2025). The rise of artificial intelligence in project management: A systematic literature review of current opportunities, enablers, and barriers. Buildings, 15(7), 1130. https://doi.org/10.3390/buildings15071130

8. Hughes, L., Mavi, R. K., & Aghajani, M. (2025). Impact of artificial intelligence on project management (PM): Multi-expert perspectives on advancing knowledge and driving innovation toward PM2030. Journal of Innovation & Knowledge, 10(3), 100772. https://doi.org/10.1016/j.jik.2025.100772

9. Pham, K. P., & Neumann, M. (2024). How to measure performance in Agile software development? A mixed-method study. arXiv:2407.06357. https://doi.org/10.48550/arXiv.2407.06357

10.      Piliukov, A. O. (2024). Comparative analysis of theories and approaches to project management. Kyiv Economic Scientific Journal, (5), 114-121. https://doi.org/10.32782/2786-765X/2024-5-17

11.      Piliukov, A. O. (2026). Conceptual basis of project management of software development enterprises. Economic Bulletin of National Technical University of Ukraine “Kyiv Polytechnic Institute”, (36), 101-108. https://doi.org/10.20535/2307-5651.36.2026.360552

12.      Song, L., & Minku, L. L. (2023). Artificial intelligence in software project management. Springer. https://doi.org/10.1007/978-3-031-19701-2

13.      Diameh, J. T., Bakare, T. O., Daniels, C., Okopido, E. S., Nelson, C. A., & Quaye, M. (2025). Integrating AI-driven predictive analytics in project risk management to optimize decision-making and performance efficiency. International Journal of Engineering Technology Research & Management, 9(3), 373-387. https://doi.org/10.5281/zenodo.15086329

14.      Forouzesh Nejad, A. A., Arabikhan, F., & Gegov, A. (2025). Data-driven predictive modelling of agile projects using explainable artificial intelligence. Electronics, 14(13), 2609. https://doi.org/10.3390/electronics14132609

15.      Oftebro, K. L., Nguyen-Duc, A., & Kemell, K.-K. (2025). GenAI-enabled backlog grooming in agile software projects: An empirical study. arXiv:2507.10753. https://doi.org/10.48550/arXiv.2507.10753

16.      Geamanu, A., Dascalu, M.-I., Neagu, A.-M., & Guica, R. I. (2026). An integrated artificial intelligence tool for predicting and managing project risks. Machine Learning and Knowledge Extraction, 8(1), 1. https://doi.org/10.3390/make8010001

17.      Leite, G. S., Vieira, R. E. P., Cerqueira, L., Maciel, R. S. P., Freire, S., & Mendonça, M. (2024). Technical debt management in Agile software development: A systematic mapping study. Proceedings of the XXIII Brazilian Symposium on Software Quality, (pp. 309-320). https://doi.org/10.1145/3701625.3701669

18.      Zaman, U., Khan, M. N., Raza, S. H., & Farías, P. (2022). Fall seven times, stand up eight: Linking project management innovation, project governance, and high-performance work practices to project success. Frontiers in Psychology, 13, 902816. https://doi.org/10.3389/fpsyg.2022.902816

19.      Moura, R. L., Carneiro, T. C. J., & Dias, T. L. (2023). VUCA environment on project success: The effect of project management methods. Brazilian Business Review, 20(3), 237-256. https://doi.org/10.15728/bbr.2023.20.3.1.en

20.      Serra, C. E. M., & Kunc, M. (2015). Benefits realisation management and its influence on project success and on the execution of business strategies. International Journal of Project Management, 33(1), 53-66. https://doi.org/10.1016/j.ijproman.2014.03.011

21.      Iriarte, C., & Bayona, S. (2020). IT projects success factors: A literature review. International Journal of Information Systems and Project Management, 8(2), 49-78. https://doi.org/10.12821/ijispm080203

22.      Alexandru, V. A., Bolisani, E., Andrei, A. G., Cegarra-Navarro, J. G., Martínez Martínez, A., Paiola, M., …, & Zieba, M. (2020). Knowledge management approaches of small and medium-sized firms: A cluster analysis. Kybernetes, 49(1), 73-87. https://doi.org/10.1108/K-03-2019-0211

23.      Slávik, Š., Bednár, R., Mišúnová Hudáková, I., & Moravčíková, K. (2020). Cluster typology of business models of start-ups. Administrative Sciences, 10(3), 54. https://doi.org/10.3390/admsci10030054

24.      Frish, S., Talmor, I., Hadar, O., Shoshany, M., & Shapira, A. (2025). Enhancing consistency of AHP-based expert judgements: A new approach and its implementation in an interactive tool. MethodsX, 14, 103341. https://doi.org/10.1016/j.mex.2025.103341

25.      Yadav, N., Sushil, & Sagar, M. (2013). Performance measurement and management frameworks: Research trends of the last two decades. Business Process Management Journal, 19(6), 947-971. https://doi.org/10.1108/BPMJ-01-2013-0003

26.      Gobov, D., & Zuieva, O. (2025). Software quality attributes in requirements engineering. International Journal of Information Technology and Computer Science, 17(4), 38-48. https://doi.org/10.5815/ijitcs.2025.04.04

27.      Savitri, N. K. W., Sandhiyasa, I. M. S., Fittryani, Y. P., Sudipa, I. G. I., & Putra, D. M. D. U. (2025). Design of real-time project monitoring dashboard using Kimball’s data warehouse approach and Google Data Studio. Sinkron: Jurnal dan Penelitian Teknik Informatika, 9(3), 1050-1060. https://doi.org/10.33395/sinkron.v9i3.14801

 

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (066) 379 72 44.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home Home EngCat Archive 2026 Content №4 2026 Modelling impact of hybrid methodology on performance of IT-enterprises