- 1. Determinants of investment potential in the context of ensuring the economic sustainability of enterprises
- (Content №2 2026)
- ... of risks and manage losses from risks. The directions of forming IPE are determined: implementation of ESG strategies, allocation of production capacity and capital as a means of reducing investment risk, ...
- Created on 25 April 2026
- 2. Scientific, technical and ecological aspects of expanding the fuel base of energy and cement production due to petroleum coke
- (Content №6 2025)
- Authors: M. V. Chernyavskyy*, orcid.org/0000-0003-4225-4984, Thermal Energy Technology Institute of National Academy of Science of Ukraine, Kyiv, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it. O. Yu. Provalov, ...
- Created on 25 December 2025
- 3. Predicting the geofiltration processes within the closed quarry zone in difficult technogenically disturbed conditions
- (Content №1 2025)
- ... Techniques – Past, Present and Future. IntechOpen. https://doi.org/10.5772/intechopen.92208. 4. Liu, G., Guo, W., Chai, S., & Li, J. (2023). Research on production capacity planning method of open-pit ...
- Created on 25 February 2025
- 4. Crushed stone supply challenges for infrastructure development in Hungary
- (Content №6 2024)
- ... demand for crushed stone. Both national and EU-funded initiatives have strained supply chains, resulting in logistical challenges and material shortages. With limited domestic production capacity, efficient ...
- Created on 28 December 2024
- 5. Establishing the influence of the quarry depth on the indicators of cyclic flow technology during the development of non-ore deposits
- (Content №1 2024)
- ... depth of 150 m. Originality. The dependence of the dump trucks productivity and their required number on the depth and production capacity of a non-ore quarry when using the haulage mining system was ...
- Created on 29 February 2024
- 6. Forms of organization of production activity of enterprises in terms of probabilistic nature of demand
- (Content №4 2021)
- ... of limited-demand products, the need in which is of probabilistic nature. Such parameters as maximum (peak) involved production capacity and maximum warehouse capacity required in terms of predicted production ...
- Created on 23 August 2021
- 7. Approbation of the technology of efficient application of excavator-automobile com-plexes in the deep open mines
- (Contens №4 2020)
- ... lag by 25 % and shortening the period for the development of the ore production capacity from 8 to 5 years. A mathematical model has been created to optimize the contours of working out stages for steeply ...
- Created on 30 August 2020
- 8. On determining productive capacity of EV traction battery repair area
- (Power Supply Technologies)
- ... Toensure the effective functioning of the area for diagnosis and repair of tractive electric vehicle (EV) battery by determining the technical and economic indicators of the production capacity of the ...
- Created on 26 October 2019
- 9. Comparative analysis of changes of market environment and development strategies of mining enterprises
- (Economy and management)
- ... materials market potential and the potential capacity of global production of titanium dioxide (TiO2) according to actual production capacity of world mining companies, including Ukrainian companies, and ...
- Created on 08 November 2012