Rational way of fastening of development workings with arch and roof bolt support

User Rating:  / 0
PoorBest 

Authors:

R.N. Tereschuk, Candidate of Technical Sciences, Associate Professor, State Higher Educational Institution «National Mining University», Doctorate of the Department of Construction and Geomechanics, Dnipropetrovsk, Ukraine

S.N. Gapeyev, Candidate of Technical Sciences, Associate Professor, State Higher Educational Institution «National Mining University», Senior Lecturer of the Department of Construction and Geomechanics, Dnipropetrovsk, Ukraine

Annotation:

The analysis of the operating conditions of development workings and behavior of the support in different geological conditions is done. Simulation results of preparatory workings fixed with arch and roof bolt support, using the finite element method are shown. The rational parameters of arch and roof bolt support of workings, both outside and in the zone of drift for maintaining their stable state are defined. Passport of fastening of development workings for geological and mining conditions of the mine «Komsomolets Donbassa» is recommended.

References:

1. Амусин Б.З. Метод конечных элементов при решении задач горной геомеханики / Б.З. Амусин, А.Б. Фадеев. – М.: Недра, 1975. – 144 с.

Amusin B.Z. Finite elements method in solution of problems of mining geomechanics / B.Z. Amusin, A.B. Fadeyev. – M.: Nedra, 1975. – 144 p.

2. Ержанов Ж.С. Метод конечных элементов в задачах механики горных пород / Ж.С. Ержанов, Т.Д. Каримбаев. – Алма-Ата.: Наука, 1975. – 238 с.

Yerzhanov Zh.S. Finite elements method in problems of rock mechanics / Zh.S. Yerzhanov, T.D. Karimbayev – Alma-Ata: Nauka, 1975. – 238 p.

Files:
2011_05_teresh
Date 2012-11-27 Filesize 584.11 KB Download 1261

Tags: development workingfinite element methodarch and roof bolt support

Newer news items:

Older news items: