Opening-out of horizons of Artemovsk deposit with use of technology of preliminary ore dressing in open pit

User Rating:  / 0
PoorBest 
Category: Development of fields
Last Updated on Monday, 03 December 2012 16:09
Published on Tuesday, 20 November 2012 13:10
Hits: 4151

Authors:

Ye.V. Babiy, Candidate of Technical Sciences, Senior Research Fellow, Institute of Geotechnical Mechanics of National Academy of Science of Ukraine, Dnepropetrovsk, Ukraine

M.A. Sinenko, Institute of Geotechnical Mechanics of National Academy of Science of Ukraine, II Category Engineer, Dnepropetrovsk, Ukraine

A.Ye. Bilenko, State Institute of Metal Mining Industry Plant Designing “KRYVBASPROEKT”, Chief Engineer, Kryvyi Rih, Ukraine

Annotation:

The main problems of the Artemovsk mining deposit developed by VAT “Tsentralny GOK” have been considered. In this article it was proposed to use the ore dressing technology in open pit along with cyclical and progressive operation technology. There were developed schemes of development of open pit levels by steeply inclined conveyors located on the pit wall and application of inclined conveyers for underground excavation.

References:

1. Четверик М.С. Вскрытие горизонтов глубоких карьеров при комбинированном транспорте / Четверик М.С.// НАН Украины, Институт геотехнической механики. – К.׃ Наукова думка, 1986. – 188 с. – Библиогр.: С. 181–184.

Chetveryk M.S. Horizon’s formation of deep open pits with use of combined transport / Chetveryk M.S. // NASU Institute of Geotechnical Mechanics. – K.: Naukova dumka, 1986. – 188 p. – Bibliograf.: P. 181–184.

2. Бабий Е.В. О качестве рудного потока при технологии предобогащения руды в карьере / Е.В. Бабий, М.А. Синенко// НАН Украины, Институт геотехнической механики.– Кривий Ріг: Вісник Криворізького технічного університету. Збірник наукових праць.– 2010.– № 25.– С. 19–24. Библиогр.: с. 24.

Babiy Ye.V. About the quality of ore flow with the use of technology of preliminary ore dressing in open pit / Ye.V. Babiy, M.A. Sinenko // NASU Institute of Geotechnical Mechanics. – Krivoy Rog: Visnyk Kryvorizkoho tekhnichnoho universytetu. Collected articles. – 2010. – No.25. – P. 19–24. Bibliograf.: p. 24.

3. Бабий Е.В. Применение крутонаклонных конвейеров при технологии предобогащения руды в карьерах / Бабий Е.В. // НАН Украины, Институт геотехнической механики.– Геотехническая механика. Межвед. сб. научн. трудов.– Днепропетровск. – 2009. – Вып. 81. – С. 17–23.– Библиогр.: с. 23. – ІSSN 1607-4556

Babiy Ye.V. The application of steeply inclined conveyors in the technology of preliminary ore dressing in open pits / Babiy Ye.V. // NASU Institute of Geotechnical Mechanics. – Geotekhnicheskaya mekhanika. Mezhved. Collected articles. – Dnepropetrovsk. – 2009. – issue 81. – P. 17–23. – Bibliograf.: p. 23. – ІSSN 1607-4556

Files: