Optimisation of the pitedges parameters at the open mine working
- Details
- Category: Development of fields
- Last Updated on Monday, 24 December 2012 15:24
- Published on Monday, 24 December 2012 15:24
- Hits: 3934
Authors: Lituchyi V.V.
The solution of important scientific and technical problems of efficiency increase and decrease in ecological consequences of open-cast mining of horizontal deposits by optimisation of parameters pitedges, providing reduction of volumes overburden works and the areas, the residual developed spaces of open-cast mines is stated. Optimum parameters of a board of an open-cast mine are by means of special, offered by the author, iterative algorithm.
Files:
2010_4 Letuchij | |
2012-12-14 545.63 KB 1234 |