Limiting of internal overvoltages in electric networks of power station auxiliaries during single-phase ground faults

User Rating:  / 0
PoorBest 

Authors:

M.S. Seheda, Dr. Sci. (Tech.), Professor, Lviv Polytechnic National University, Head of the Department of Electric Stations, Lviv, Ukraine

N.O. Ravlyk, Lviv Polytechnic National University, Assistant Lecturer of the Department of Electric Stations, Lviv, Ukraine

Abstract:

Purpose. Development of measures to limit the internal overvoltages in electric networks of power stations auxiliaries during single-phase ground faults in order to ensure the reliability of their operation.

Methodology. Mathematical model of the electrical network, control and protection devices in mesh-node coordinates was proposed. The asynchronous motor processes to analyze the electromagnetic processes in electric networks of power stations auxiliaries were taken into account. The internal overvoltages in electric networks of power stations auxiliaries during single-phase ground faults were analyzed using the methods of mathematical modeling based on digital models. The special measures to limit the internal overvoltage were proposed. In order to simulate the transverse asymmetry, including single-phase ground faults the capacitive elements were proposed for usage considering the second law of commutation.

Findings. The internal overvoltage in electric networks of power stations auxiliaries were investigated during single-phase ground faults using different limitation measures, in particular by installing of nonlinear surge protection devices and capacitor banks.

Originality. Inthe paper in order to restrict the internal overvoltage and improve the start-up conditions of synchronous and asynchronous motors it was proposed to install the capacitor banks on buses of power station auxiliaries. Proposed measures also allow solving the problem of the voltage regulation.

Practical value. The reliability of electrical networks of power station auxiliaries, as well as providing the technological process of electrical energy production by electrical stations depends on coordination of their insulation during single-phase ground faults. Currently such studies can be performed using mathematical experiments on digital models.

References:

1. Внутрішні перенапруги в електричних мережах 6–10кВ та захист від перенапруг / М.С. Сегеда, З.М. Бахор, Н.О. Равлик, Г.Ш. Бакало // Праці Інституту електродинаміки НАН України. – 2006. – №1(13) – С. 23–30.

Seheda, M.S., Bahor, Z.M., Ravlyk ,N.O. and Bakalo, G.Sh. (2006), Internal overvoltage in networks 6…10 kv and overvoltage protection”, Pratsi Instytutu Elektrodynamiky NAN Ukrainy, no. 1(13), pp. 23–30.

2. Сегеда М.С. Покращення пуску асинхронних двигунів власних потреб електричних станцій / М.С. Сегеда, Н.О. Равлик, Г.Ш. Бакало // Вісник Національного університету „Львівська політехніка“. Електроенергетичні та електромеханічні системи. – 2009. –№ 654. –С. 199 –202.

Seheda, M.S., Ravlyk, N.O. and Bakalo, G.Sh. (2009), “Improvement of start-up conditions of asynchnous motors of power station auxiliaries”, Visnyk Natsionalnogo Universytetu Lvivska Politechnika”  “Elektroenergetychni ta Elektromechanichni Systemy, no.654, pp. 199–202.

3. Сивокобыленко В.Ф. Переходные процессы в электрических сетях с резисторным заземлением нейтрали:  материалы международной научно-технической конференции „Перспективы и инновации в науке, образовании, производстве 2010“ / В.Ф. Сивокобыленко, В.К. Лебедев, Р.П. Сердюков // Технические науки. Проект SWorld. – Одесса: Черноморье, 2010. – Т. 6. –С. 27–35.

Sivokobylenko, V.F., Lebedev,V.K. and Serdiukov, R.P.(2010), “Transient processes in elektic networks with resist or grounded neutral”, Proc. of the Int. Conf. Perspektivy innovatsii nauke, obrazovanii proizvodstve, Vol. 6, Engineering Science, ProektSWorld, Chernomorye, Odessa,pp. 27–35.

4. Сивокобыленко В.Ф. Развитие математической модели для анализа переходных процессов в системе собственных нужд электростанции при замыкании фазы на землю / В.Ф. Сивокобыленко, В.К. Лебедев, Р.П. Сердюков // Наукові праці Донецького національного технічного університету. Серія „Електротехніка і енергетика“. – Донецьк, 2011. – вип. 10 (180). – С. 153–161.

Sivokobylenko, V.F., Lebedev,V.K. and Serdiukov, R.P.(2011), “Development of mathematical models for transient processes analysis during the phase ground fault”, Naukovi Pratsi Donetskogo Natsionalnogo Technichnogo Universytetu, Electronics and Power Engineering, Vol. 10 (180), Donetsk: DVNZ “DonNTU”, pp. 153–161.

5. Шкрабец Ф.П. Применение напряжения 35 кВ для систем электроснабжения подземных  электроприемников глубоких энергоемких шахт / Ф.П. Шкрабец, А.В. Остапчук // Науковий вісник Національного гірничого університету. – 2013. – № 1(133). – С. 83–90.

Shkrabets, F.P. and Ostapchuk, A.V. (2013), “Application of 35 kilovolt voltage for underground power consumers supply systems of deep power-intensive mines”, Naukovyy Visnyk Natsionalnoho Hirnychoho Universytetu, no. 1. (133), pp. 83–90.

Files:
2014_6_seheda
Date 2015-01-13 Filesize 421.72 KB Download 838

Visitors

6308572
Today
This Month
All days
837
43764
6308572

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (056) 746 32 79.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home Archive by field of science Electrical engineering Limiting of internal overvoltages in electric networks of power station auxiliaries during single-phase ground faults