About perfecting of the system of adoption of the new equipment on mines Personnel problem
- Details
- Category: Ecology
- Last Updated on Wednesday, 24 September 2014 14:56
- Published on Tuesday, 25 December 2012 15:55
- Hits: 4540
Authors: Yu.I. Kiiashko, V.G. Shevchenko.
The new approach and complex of methods on perfecting a system of an intrusion of new refining engineering at a stage guard rope of staff and estimation of features of their work is offered. The techniques of definition of readiness of the collier and labor collective to high-performance and safe operation are designed, which one are trusted to in the basis the algorithms of a analysis of the colliers characteristics and operating analysis of parameters of their personal and collective work. The examples of application of the tendered approach are adduced and the estimation of its efficiency is given.
Files:
2010_05 Kiyas | |
2012-12-14 381.18 KB 1414 |