About perfecting of the system of adoption of the new equipment on mines Personnel problem

User Rating:  / 1
PoorBest 

Authors: Yu.I. Kiiashko, V.G. Shevchenko. 

 
The new approach and complex of methods on perfecting a system of an intrusion of new refining engineering at a stage guard rope of staff and estimation of features of their work is offered. The techniques of definition of readiness of the collier and labor collective to high-performance and safe operation are designed, which one are trusted to in the basis the algorithms of a analysis of the colliers characteristics and operating analysis of parameters of their personal and collective work. The examples of application of the tendered approach are adduced and the estimation of its efficiency is given.
Files:
2010_05 Kiyas
Date 2012-12-14 Filesize 381.18 KB Download 1414

Visitors

7360911
Today
This Month
All days
442
50414
7360911

Guest Book

If you have questions, comments or suggestions, you can write them in our "Guest Book"

Registration data

ISSN (print) 2071-2227,
ISSN (online) 2223-2362.
Journal was registered by Ministry of Justice of Ukraine.
Registration number КВ No.17742-6592PR dated April 27, 2011.

Contacts

D.Yavornytskyi ave.,19, pavilion 3, room 24-а, Dnipro, 49005
Tel.: +38 (056) 746 32 79.
e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
You are here: Home Archive by field of science Ecology About perfecting of the system of adoption of the new equipment on mines Personnel problem